| State: Odisha |
District: Ganjam |
Block: Patrapur |
Gram Panchayat: Tandipur |
Work Code: OD/354/3379/117894/413152/00052877 (CONST OF CC ROAD AND PAVER BLOCK ROAD AT PWD ROAD AT PANASA KHOLA)
Project Category: Road
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Patrapur |
Proposal Date: - |
| Date of Commencement: 14-11-2025 |
Date of Completion: - |
| Scheme Name: Chief Minister Special Assistant |
Scheme Component Name: Special Problem Fund (SPF) 16 th Phase |
| Project Sub-Category: Pavor Block |
Project Type: New Work |
| Name of Executant: SUNIL KUMAR JANI |
|
Administrative Approval Details
Approval No.: OD/354/3379/117894/413152/00052877/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3379/117894/413152/00052877/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| 462 |
562 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
36.8253 |
Cubic Meter |
0.516 |
19.0018548 |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
108.3431 |
Cubic Meter |
0.1236 |
13.39120716 |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
28.23273 |
Cubic Meter |
3.9 |
110.107647 |
- |
- |
0.18 |
5.0818914 |
| 4 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
245.502 |
Square Meter |
- |
- |
0.05 |
12.2751 |
0.05 |
12.2751 |
| 6 |
Earth Work (AR0110) : Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface.
|
861.4 |
Square Meter |
0.01 |
8.614 |
- |
- |
- |
- |
| Total Qty |
151.11470896 |
17.3569914 |
12.2751 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
69814.99553952 |
9754.6291668 |
6284.8512 |
Total Labour Amount (in Rs.): 85854.47590632