State: Odisha District: Bhadrak Block: Basudevpur Gram Panchayat: Nuagan
Work Code: OD/348/3322/116606/394913/00055398 (Repair/Mainteance of road from Ratna Das House to Ramesh Malik House)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Basudevpur Proposal Date: -
Date of Commencement: 24-09-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant: SATYA NARAYAN PATRA
Administrative Approval Details
Approval No.: OD/348/3322/116606/394913/00055398/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3322/116606/394913/00055398/TS
Fund Sanction No.: 28963
Fund Sanction Amount (in Rs.): 160000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0108) : extra lift of 1.5m to 3.0m - Extra lift of 1.5m or part thereof over the initial lift of 1.5m in all kinds of embankments and road works and ordinary earthwork in general.(1st extra lift of 1.5m to 3.0m) 3.864 Cubic Meter 0.041 0.158424 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 8.4 Cubic Meter 0.1236 1.03824 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.976 Cubic Meter 3.9 42.8064 - - 0.18 1.97568
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 8.4 Cubic Meter 4.6 38.64 - - 0.68 5.712
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.8 Square Meter - - 0.05 0.84 0.05 0.84
Total Qty 82.643064 8.52768 0.84
Rate Per Man Day 462 562 512
Total Amount 38181.095568 4792.55616 430.08
Total Labour Amount (in Rs.): 43403.731728