State: Odisha District: Ganjam Block: Aska Gram Panchayat: Pandiapathara
Work Code: OD/354/3364/117591/411219/00061751 (Repair & Maintenance of Bajrakote PUPS)
Project Category: Building
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Aska Proposal Date: -
Date of Commencement: 12-01-2026 Date of Completion: -
Scheme Name: Maintenance of Non Residential Building Scheme Component Name: MAINTENANCE OF NON-RESIDENTIAL BUILDING
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant: G Ramesh Chandra Pradhan
Administrative Approval Details
Approval No.: OD/354/3364/117591/411219/00061751/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3364/117591/411219/00061751/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 150000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
462 562 612 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.9869184 Cubic Meter 0.1236 1.35798311424 - - - - - -
2 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 6.4279136 Cubic Meter 3.9 25.06886304 - - 0.18 1.157024448 - -
3 Plastering (AR1027) : 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 78.317229 Square Meter 0.17 13.31392893 - - 0.14 10.96441206 - -
4 Masonry Brick Work (AR06059) : Brick work with K.B. bricks 25cm x 12cm x 8cm - Brick work with K.B. bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 Kg/cm2 with dimensional tolerance ± 8 percent in cement mortar (1:3) in foundation and plinth 7.592442 Cubic Meter 2.82 21.41068644 - - 1.05 7.9720641 0.35 2.6573547
5 R.C.C. Work (AR0409) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 1.8 Quintal 0.8 1.44 0.044 0.0792 - - 0.3 0.54
6 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.300677 Cubic Meter 4.6 15.1831142 - - 0.68 2.24446036 - -
7 Painting (AR0901d) : Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 84.355924 Square Meter 0.053763440860215 4.5352647311828 - - - - 0.053763440860215 4.5352647311828
8 Painting (AR0920) : Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 84.355924 Square Meter 0.064 5.398779136 - - - - 0.054 4.555219896
Total Qty 87.708619591423 22.337960968 12.287839327183 0.0792
Rate Per Man Day 462 562 612 512
Total Amount 40521.382251237 12553.934064016 7520.1576682359 40.5504
Total Labour Amount (in Rs.): 60636.024383489