State: Odisha District: Rayagada Block: Ramanaguda Gram Panchayat: Gogupadu
Work Code: OD/370/3556/121239/426735/00061910 (RENOVATION OF TANK AT SULUDI GOGUPADU GP)
Project Category: Water Body
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Ramanaguda Proposal Date: 11-10-2021
Date of Commencement: 01-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Preservation and Development of Water Bodies
Project Sub-Category: Tank Project Type: New Work
Name of Executant: BABULAL PALAI
Administrative Approval Details
Approval No.: OD/370/3556/121239/426735/00061910/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3556/121239/426735/00061910/TS
Fund Sanction No.: 20430
Fund Sanction Amount (in Rs.): 663375
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 54.3375 Cubic Meter 0.516 28.03815 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 18.1125 Cubic Meter 0.1236 2.238705 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 105.225 Cubic Meter 3.9 410.3775 - - 0.18 18.9405
4 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 2.5875 Cubic Meter 4.6 11.9025 - - 0.68 1.7595
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 241.5 Square Meter - - 0.05 12.075 0.05 12.075
Total Qty 452.556855 32.775 12.075
Rate Per Man Day 462 562 512
Total Amount 209081.26701 18419.55 6182.4
Total Labour Amount (in Rs.): 233683.21701