State: Odisha District: Cuttack Block: Tigiria Gram Panchayat: Baliput
Work Code: OD/350/3345/275453/398991/00062054 (REpair and Maint of Road from Rabi Dehuri House to Bilash Naik House , Godarabandha )
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Tigiria Proposal Date: 12-11-2021
Date of Commencement: 06-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant: DIPTIMAYEE SAHU
Administrative Approval Details
Approval No.: OD/350/3345/275453/398991/00062054/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3345/275453/398991/00062054/TS
Fund Sanction No.: 300000
Fund Sanction Amount (in Rs.): 300000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.090848 Cubic Meter 0.516 3.658877568 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.63846114 Cubic Meter 0.1236 1.932913796904 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 24.83651582 Cubic Meter 3.9 96.862411698 - - 0.18 4.4705728476
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 46.554048 Square Meter - - 0.05 2.3277024 0.05 2.3277024
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 17.44102398 Cubic Meter 4.6 80.228710308 - - 0.68 11.8598963064
Total Qty 182.6829133709 18.658171554 2.3277024
Rate Per Man Day 462 562 512
Total Amount 84399.505977358 10485.892413348 1191.7836288
Total Labour Amount (in Rs.): 96077.182019506