State: Odisha District: Ganjam Block: Buguda Gram Panchayat: Kalamba
Work Code: OD/354/3368/117664/410449/00062137 (Construction of CC/Paver Road Sunakera RD Road to Primary school)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Buguda Proposal Date: -
Date of Commencement: 04-11-2025 Date of Completion: 15-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Pavor Block Project Type: New Work
Name of Executant: Prasan Kumar Sahu
Administrative Approval Details
Approval No.: OD/354/3368/117664/410449/00062137/AS
Technical Sanction Details
Technical Sanction No.: OD/354/3368/117664/410449/00062137/TS
Fund Sanction No.: 7723
Fund Sanction Amount (in Rs.): 143704
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai16) : Earthwork in all kinds of soil within 50m lead, with four extra lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth - Earthwork in all kinds of soil within 50m lead, with four extra lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 2.2218 Cubic Meter 0.637534 1.4164730412 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.33 Cubic Meter 0.1236 1.894788 - - - -
3 Concrete (AR0304) : Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.2218 Cubic Meter 3.9 8.66502 - - 0.18 0.399924
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 19.32 Square Meter - - 0.05 0.966 0.05 0.966
Total Qty 11.9762810412 1.365924 0.966
Rate Per Man Day 462 562 512
Total Amount 5533.0418410344 767.649288 494.592
Total Labour Amount (in Rs.): 6795.2831290344