State: Odisha District: Jagatsinghpur Block: Erasama Gram Panchayat: Nuadihi
Work Code: OD/355/3388/118109/397331/00062267 (Repair and maintenance of PHC building at Mallipur)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Erasama Proposal Date: -
Date of Commencement: 20-11-2025 Date of Completion: -
Scheme Name: Asset Management Health and Family Welfare Department Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Primary Health Centre Project Type: Repair and Maintenance
Name of Executant: Susanta Kumar Nanda
Administrative Approval Details
Approval No.: OD/355/3388/118109/397331/00062267/AS
Technical Sanction Details
Technical Sanction No.: OD/355/3388/118109/397331/00062267/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 155000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Highly-Skilled Un-Skilled Skilled
612 462 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Painting (AR0903b) : Painting two coats of enamel paint with a coat of red oxide primer over iron surface - Painting two coats of enamel paint with a coat of red oxide primer over iron surface including all costs of labour, Paint, Primer, brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge. 39.762484 Square Meter 0.17204301075269 6.8408574623656 - - 0.18817204301075 7.4821878494624
2 Other Building Items. (AR1902) : cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 147.71577 Square Meter 0.057 8.41979889 0.05 7.3857885 - -
3 Painting (AR0918cb) : Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 196.211136 Square Meter 0.11776344086022 23.106498510452 - - 0.10776344086022 21.144387150452
4 Painting (AR0921b) : Finishing wall One Coat with distemper of approved shades with one coat water bound Primer on old work (Inside) - Finishing wall surface with One Coat with distemper of approved shades above one coat waterbound Primer on old work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge..(Inside) 319.679223 Square Meter 0.093763440860215 29.97422392 - - 0.086763440860215 27.736469359
Total Qty 56.363044358914 68.341378782817 7.3857885
Rate Per Man Day 612 462 562
Total Amount 34494.183147655 31573.716997662 4150.813137
Total Labour Amount (in Rs.): 70218.713282317