State: Odisha District: Gajapati Block: Kasinagar Gram Panchayat: Sidhamadanga
Work Code: OD/353/3359/117488/414615/00063449 (Improvement of Sidhamadanga Harijan Sahi Road)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Kasinagar Proposal Date: 04-12-2021
Date of Commencement: 18-11-2025 Date of Completion: 09-01-2026
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Subhasmita Simalu
Administrative Approval Details
Approval No.: OD/353/3359/117488/414615/00063449/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3359/117488/414615/00063449/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 100000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 6.4562304 Cubic Meter 0.516 3.3314148864 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.889878816 Cubic Meter 0.1236 0.4807890216576 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 7.731335904 Cubic Meter 3.9 30.1522100256 - - 0.18 1.39164046272
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 15.886413 Square Meter - - 0.05 0.79432065 0.05 0.79432065
5 Concrete (AR0307) : Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 5.2456872 Cubic Meter 4.6 24.13016112 - - 0.68 3.567067296
Total Qty 58.094575053658 5.75302840872 0.79432065
Rate Per Man Day 462 562 512
Total Amount 26839.69367479 3233.2019657006 406.6921728
Total Labour Amount (in Rs.): 30479.58781329