State: Odisha District: Nayagarh Block: Odagaon Gram Panchayat: Haridabandha
Work Code: OD/367/3529/275508/406719/00064750 (Const. Of Market complex at Haridabandha)
Project Category: Building
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Odagaon Proposal Date: -
Date of Commencement: 21-11-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Sradhanjali Sathua Mohapatra
Administrative Approval Details
Approval No.: OD/367/3529/275508/406719/00064750/AS
Technical Sanction Details
Technical Sanction No.: OD/367/3529/275508/406719/00064750/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Highly-Skilled Semi-Skilled
462 562 612 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Plastering (AR1027) : First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 113.55 Square Meter 0.1751 19.882605 - - 0.1442 16.37391 - -
2 Masonry Brick Work (AR0603bi) : First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 25.385625 Cubic Meter 3.404 86.4126675 - - 1.2075 30.6531421875 0.4025 10.2177140625
3 Concrete (AR0317) : First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 94.175 Square Meter 0.414 38.98845 - - - - 0.115 10.830125
4 Flooring (AR0817ac) : First floor - Fixing Vitrified industrial Tile of premium grade having thickness 8mm to 10mm confirming to IS 4457 of size 300mmx300mm in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 8.12 Square Meter 0.34125 2.77095 0.798 6.47976 - - 0.34125 2.77095
5 Flooring (AR0817bb) : First floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm Coloured /Printed series(Homogeneous) in wall cladding/ glazed tiles on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the vitrified tiles including rubbing and polishing complete including cost of precast tiles. 60.1575 Square Meter 0.34125 20.528746875 - - - - 0.34125 20.528746875
6 Painting (AR0901ci) : First Floor - Priming one coat with outer surface primer of approved quality oil-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 113.72 Square Meter 0.056451612903226 6.4196774193548 - - - - 0.056451612903226 6.4196774193548
7 Plastering (AR1014) : First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 181.88 Square Meter 0.2472 44.960736 - - 0.1648 29.973824 - -
8 Painting (AR0918f) : First Floor - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 113.72 Square Meter 0.0672 7.641984 - - - - 0.0567 6.447924
9 Painting (AR0920a) : First Floor - Finishing wall surface with two coats with plastic emulsion paint of approved shades above one coat oil bound Primer on new work to give an even shade including all costs of labor, Paint, Primer, Brushes and putty required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 295.47 Square Meter 0.12129634408602 35.839430787097 - - - - 0.11099634408602 32.796089787097
10 R.C.C. Work (AR0404Ac) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 7.784375 Cubic Meter 1.533295 11.935743265625 6.352395 49.449424828125 6.4015 49.8316765625 - -
11 R.C.C. Work (AR0404Ad) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.88125 Cubic Meter 1.533295 1.35121621875 2.758395 2.43083559375 2.8075 2.474109375 - -
12 R.C.C. Work (AR0404Ag) : First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 11.771875 Cubic Meter 1.533295 18.049757078125 3.732195 43.934933015625 3.7813 44.5129909375 - -
13 Other Building Items. (AR1902) : First Floor - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 295.47 Square Meter 0.05871 17.3470437 - - 0.0515 15.216705 - -
14 R.C.C. Work (AR0409) : First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 25.74 Quintal 0.84 21.6216 0.0462 1.189188 - - 0.315 8.1081
15 Plastering (AR1004) : First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 124.0575 Square Meter 0.1236 15.333507 - - 0.1442 17.8890915 - -
Total Qty 349.08411484395 206.9254495625 98.119327143952 103.4841414375
Rate Per Man Day 462 562 612 512
Total Amount 161276.86105791 116292.10265413 60049.028212098 52983.880416
Total Labour Amount (in Rs.): 390601.87234013