State: Odisha District: Gajapati Block: Kasinagar Gram Panchayat: Parthada
Work Code: OD/353/3359/117485/414559/00064754 (Improvement of Tank at T.Gorba in Convergence with MGNREGA)
Project Category: Water Body
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Kasinagar Proposal Date: -
Date of Commencement: 24-11-2025 Date of Completion: -
Scheme Name: Kandhamal O Gajapati Bikas Yojana Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Tank Project Type: Upgradation or Improvement
Name of Executant: Raj Kumar Sahoo
Administrative Approval Details
Approval No.: OD/353/3359/117485/414559/00064754/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3359/117485/414559/00064754/TS
Fund Sanction No.: 2022
Fund Sanction Amount (in Rs.): 200000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.916 Cubic Meter 0.516 1.504656 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 0.243 Cubic Meter 0.1236 0.0300348 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 5.832 Cubic Meter 3.9 22.7448 - - 0.18 1.04976
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 12.96 Square Meter - - 0.05 0.648 0.05 0.648
Total Qty 24.2794908 1.69776 0.648
Rate Per Man Day 462 562 512
Total Amount 11217.1247496 954.14112 331.776
Total Labour Amount (in Rs.): 12503.0418696