State: Odisha District: Cuttack Block: Mahanga Gram Panchayat: Kuhunda
Work Code: OD/350/3339/117001/399490/00066635 (Metal & Moorum road from Kuhunda dandi to Naga tota road)
Project Category: Road
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Mahanga Proposal Date: -
Date of Commencement: 05-12-2025 Date of Completion: 24-12-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: Mettalling Road Project Type: Upgradation or Improvement
Name of Executant: JAGANNATH PRASADA BARIK
Administrative Approval Details
Approval No.: OD/350/3339/117001/399490/00066635/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3339/117001/399490/00066635/TS
Fund Sanction No.: 9122
Fund Sanction Amount (in Rs.): 143704
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled
462
Qty/Unit (B) Total Qty (A*B)
1 Road Work (AR1308) : moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 31.923227648 Cubic Meter 1.1333922261484 36.181538049809
2 Road Work (AR1306) : Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. 31.923227648 Cubic Meter 0.25 7.980806912
3 Road Work (AR1309) : metal and packing the voids with small stones and hand packing the same to proper camber - Supplying & spreading metal and packing the voids with small stones and hand packing the same to proper camber including conveying spreading of moorum and filling the interstices by spreading the same over the surface, watering, and consolidation with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge.(To be used for minor repair works only) (Complete thickness 75mm) 25.32371424 Cubic Meter 1.4134275618375 35.793235674912
Total Qty 79.955580636721
Rate Per Man Day 462
Total Amount 36939.478254165
Total Labour Amount (in Rs.): 36939.478254165