State: Odisha District: Jajpur Block: Sukinda Gram Panchayat: Sarangapur
Work Code: OD/356/3403/118513/400565/00067170 (Renovation of Brahman Sahi Pond)
Project Category: Water Body
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Sukinda Proposal Date: -
Date of Commencement: 10-12-2025 Date of Completion: 06-01-2026
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Pathway Project Type: Renovation or Rejuvenation
Name of Executant: Hiranya Laxmi Nayak
Administrative Approval Details
Approval No.: OD/356/3403/118513/400565/00067170/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3403/118513/400565/00067170/TS
Fund Sanction No.: 8050
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Semi-Skilled Skilled
462 512 562
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 21.42 Cubic Meter 0.516 11.05272 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 44.625 Cubic Meter 0.1236 5.51565 - - - -
3 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 180.88 Square Meter - - 0.05 9.044 0.05 9.044
5 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.132 Cubic Meter 3.9 105.8148 - - 0.18 4.88376
Total Qty 122.38317 9.044 13.92776
Rate Per Man Day 462 512 562
Total Amount 56541.02454 4630.528 7827.40112
Total Labour Amount (in Rs.): 68998.95366