State: Odisha District: Puri Block: Brahmagiri Gram Panchayat: Manapada
Work Code: OD/369/3537/120903/409943/00069676 (Renovation of pond at SisupurVillage)
Project Category: Water Body
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Brahmagiri Proposal Date: -
Date of Commencement: 11-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Guard Wall or Retaining Wall or Protection Wall Project Type: New Work
Name of Executant: GITANJALI BEHERA
Administrative Approval Details
Approval No.: OD/369/3537/120903/409943/00069676/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3537/120903/409943/00069676/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 500000
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 76.45536 Cubic Meter 0.516 39.45096576 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.74256 Cubic Meter 0.1236 1.574980416 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 69.1496256 Cubic Meter 3.9 269.68353984 - - 0.18 12.446932608
4 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 209.03175 Square Meter - - 0.05 10.4515875 0.05 10.4515875
Total Qty 310.709486016 22.898520108 10.4515875
Rate Per Man Day 462 562 512
Total Amount 143547.78253939 12868.968300696 5351.2128
Total Labour Amount (in Rs.): 161767.96364009