State: Odisha District: Jajpur Block: Sukinda Gram Panchayat: Gobarghati
Work Code: OD/356/3403/118498/400567/00071243 (Const. of Paver Block Road from BIr Bhumi Playground to Ambagadia)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Sukinda Proposal Date: -
Date of Commencement: 22-12-2025 Date of Completion: 07-01-2026
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD
Project Sub-Category: Pavor Block Project Type: New Work
Name of Executant: Hiranya Laxmi Nayak
Administrative Approval Details
Approval No.: OD/356/3403/118498/400567/00071243/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3403/118498/400567/00071243/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 447264
LABOUR STATEMENT
Sl.No. Activity Name Quantity (A) Unit Un-Skilled Skilled Semi-Skilled
462 562 512
Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B) Qty/Unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 15.45 Cubic Meter 0.516 7.9722 - - - -
2 Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 37.595 Cubic Meter 0.1236 4.646742 - - - -
3 Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 24.72 Cubic Meter 3.9 96.408 - - 0.18 4.4496
5 R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 74.16 Square Meter - - 0.05 3.708 0.05 3.708
Total Qty 109.026942 8.1576 3.708
Rate Per Man Day 462 562 512
Total Amount 50370.447204 4584.5712 1898.496
Total Labour Amount (in Rs.): 56853.514404