| State: Odisha |
District: Mayurbhanj |
Block: Baripada |
Gram Panchayat: Khadisole |
Work Code: OD/365/3490/120104/390491/00071842 (Renovation with Toe wall at Dumapada Bhalu bandha tank)
Project Category: Water Body
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Baripada |
Proposal Date: - |
| Date of Commencement: 29-01-2026 |
Date of Completion: - |
| Scheme Name: Bikashita Gaon Bikashita Odisha |
Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO) |
| Project Sub-Category: Tank |
Project Type: New Work |
| Name of Executant: CHAPALA CHANDA PRADHAN |
|
Administrative Approval Details
Approval No.: OD/365/3490/120104/390491/00071842/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3490/120104/390491/00071842/TS
Fund Sanction No.: 7323
Fund Sanction Amount (in Rs.): 314244
LABOUR STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
Un-Skilled
|
Skilled
|
Semi-Skilled
|
| 462 |
562 |
512 |
| Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
Qty/Unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge
|
18.3492864 |
Cubic Meter |
0.516 |
9.4682317824 |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) : Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge.
|
3.5679168 |
Cubic Meter |
0.1236 |
0.44099451648 |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) : Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge.
|
26.5045248 |
Cubic Meter |
3.9 |
103.36764672 |
- |
- |
0.18 |
4.770814464 |
| 4 |
R.C.C. Work (AR0410c) : R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc
|
66.89016 |
Square Meter |
- |
- |
0.05 |
3.344508 |
0.05 |
3.344508 |
| 5 |
Earth Work (AR0102b) : Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift and Compaction with P.R.R - Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with P.R.R. including hire and running charges of P.R.R. (section measurement to be taken on the finished compacted section of the fill) as per direction of Engineer-in-Charge.
|
509.7024 |
Cubic Meter |
0.43 |
219.172032 |
- |
- |
- |
- |
| Total Qty |
332.44890501888 |
8.115322464 |
3.344508 |
| Rate Per Man Day |
462 |
562 |
512 |
| Total Amount |
153591.39411872 |
4560.811224768 |
1712.388096 |
Total Labour Amount (in Rs.): 159864.59343949