State: Odisha District: Khordha Block: Bhubaneswar Gram Panchayat: Malipada
Work Code: OD/362/3460/119611/407475/00013171 (Completion of Kalyan Mandap at Malipada)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhubaneswar Proposal Date: -
Date of Commencement: 21-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Kalyan Mandap Project Type: Completion
Name of Executant: Itishree P Behura
Administrative Approval Details
Approval No.: OD/362/3460/119611/407475/00013171/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3460/119611/407475/00013171/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM162 BRM341 BRM340 BRM028 BRM060 BRM052 BRM084 BRM104
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 44.845 Qntl 0.8 35.876 1.05 47.08725 - - - - - - - - - - - -
2 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 14.976 Cum - - - - 3.4733 52.0161408 0.45 6.7392 0.36 5.39136 0.54 8.08704 4.4196 66.1879296 0.041529 0.621938304
3 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 27.9605 Cum - - - - 3.4733 97.11520465 0.45 12.582225 0.36 10.06578 0.54 15.09867 6.2216 173.9590468 0.0502172 1.4040980206
4 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 198 Sqm - - - - 0.0744 14.7312 0.021 4.158 - - - - - - - -
Total Qty 35.876 47.08725 163.86254545 23.479425 15.45714 23.18571 240.1469764 2.0260363246
Rate Per Unit 90.1 6216.787 569.387 403.69 2194.48 2179.1 250.166 58573.086
Total Amount 3232.4276 292731.40366575 93301.203166139 9478.40907825 33920.3845872 50523.980661 60076.608498082 118671.19987992
Total Material Amount (in Rs.): 661935.61713634