State: Odisha District: Gajapati Block: Gosani Gram Panchayat: Badakathuru
Work Code: OD/353/3357/117439/414726/00013345 (Renovation of Chintala Tank at Adagam of GP-Badakatturu)
Project Category: Water Body
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Gosani Proposal Date: 04-12-2021
Date of Commencement: 04-07-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: Renovation or Rejuvenation
Name of Executant: HARIHAR BISWAL
Administrative Approval Details
Approval No.: OD/353/3357/117439/414726/00013345/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3357/117439/414726/00013345/TS
Fund Sanction No.: 4465
Fund Sanction Amount (in Rs.): 115000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a) :.Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 468 Cum - - - - - - - - - - - -
2 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 1.8 Cum 2.29 4.122 0.48 0.864 0.96 1.728 - - - - - -
3 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.3 Cum 3.23 0.969 0.45 0.135 - - 0.9 0.27 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 24 Sqm - - - - - - - - 0.00267 0.06408 0.126 3.024
Total Qty 5.091 0.999 1.728 0.27 0.06408 3.024
Rate Per Unit 342.707 613.29 1531.66 1933.03 58763.326 419.346
Total Amount 1744.721337 612.67671 2646.70848 521.9181 3765.55393008 1268.102304
Total Material Amount (in Rs.): 10559.68086108