State: Odisha District: Malkangiri Block: Malkangiri Gram Panchayat: Jharapalli
Work Code: OD/364/3484/119997/430170/00013433 (Construction of Market Complex at Jharapalli)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Malkangiri Proposal Date: 19-02-2024
Date of Commencement: 14-12-2024 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Er. MANISHA PUJARI
Administrative Approval Details
Approval No.: OD/364/3484/119997/430170/00013433/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3484/119997/430170/00013433/TS
Fund Sanction No.: 12821
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM044 BRM340 BRM028 BRM060 BRM052 BRM162 BRM341 BRMMR0025 BRM005 BRM057 BRM140 BRMMR0038 BRM141 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0122Ai1) :.Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth - Earthwork in all kinds of soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 29.826 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.6845 Cum 1 22.6845 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0304) :.Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 39.554175 Cum - - 0.96 37.972008 1.72 68.033181 0.48 18.986004 - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 24.47424 Cum - - - - 3.4733 85.006377792 0.45 11.013408 0.36 8.8107264 0.54 13.2160896 - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 24 Qntl - - - - - - - - - - - - 0.8 19.2 1.05 25.2 - - - - - - - - - - - - - -
6 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 22.750105 Cum - - - - 0.672 15.28807056 0.28 6.3700294 - - - - - - - - 1 22.750105 350 7962.53675 - - - - - - - - - -
7 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 158.36 Sqm - - - - 0.043 6.80948 0.018 2.85048 - - - - - - - - - - - - - - - - - - - - - -
8 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 64.08 Sqm - - - - 0.0858 5.498064 0.012 0.76896 - - - - - - - - - - - - 0.023 1.47384 - - - - - - - -
9 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 613.94 Sqm - - - - - - - - - - - - - - - - - - - - - - 0.125 76.7425 - - - - - -
10 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 138.3 Sqm - - - - 0.0358 4.95114 0.015 2.0745 - - - - - - - - - - - - - - - - - - - - - -
11 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 613.94 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.8 491.152 - - - -
12 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 34.02 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 4.2525 - -
13 Painting(AR0918f) :.Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work(Outside) - Finishing wall with two coat weather coat paint of approved shade in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 138.3 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 17.2875
Total Qty 22.6845 37.972008 185.586313352 42.0633814 8.8107264 13.2160896 19.2 25.2 22.750105 7962.53675 1.47384 76.7425 491.152 4.2525 17.2875
Rate Per Unit 478.15 1440.52 673.604 678.39 1863.94 1827.56 90.1 6455.924 33 6.3895 1530.46 249.74244 30 205.74244 195.19244
Total Amount 10846.593675 54699.43696416 125011.68301916 28535.377307946 16422.665366016 24153.196709376 1729.92 162689.2848 750.753465 50876.628564125 2255.6531664 19165.8592017 14734.56 874.9197261 3374.3893065
Total Material Amount (in Rs.): 516120.92127148