State: Odisha District: Jharsuguda Block: Jharsuguda Gram Panchayat: H.Katapalli
Work Code: OD/357/3404/118520/381114/00013551 (Consruction of Market complex at Boxi chowk)
Project Category: Building
Financial Year: 2020-21 Execution Level: ps
Executing Agency: Panchayat Samiti, Jharsuguda Proposal Date: 02-11-2023
Date of Commencement: 22-07-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Fagu Murmu Transferred
Administrative Approval Details
Approval No.: OD/357/3404/118520/381114/00013551/AS
Technical Sanction Details
Technical Sanction No.: OD/357/3404/118520/381114/00013551/TS
Fund Sanction No.: 1111
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM006 BRMMR0025 BRM005 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM162 BRM341 BRM057 BRM253 BRM142 BRM137 BRM141
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 48.7764 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 22.0524 Cum 1 22.0524 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.8264 Cum - - 2.29 24.792456 0.48 5.196672 0.96 10.393344 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0602c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:4) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:4) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 10.86105 Cum - - 1 10.86105 0.28 3.041094 - - 400 4344.42 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 18.28477 Cum - - 0.672 12.28736544 0.28 5.1197356 - - - - 1 18.28477 350 6399.6695 - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 7.8204 Cum - - 3.4733 27.16259532 0.45 3.51918 - - - - - - - - 0.36 2.815344 0.54 4.223016 0.004005 0.031320702 0.189 1.4780556 - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 2.789417 Cum - - 3.4733 9.6884820661 0.45 1.25523765 - - - - - - - - 0.36 1.00419012 0.54 1.50628518 0.01335 0.03723871695 0.63 1.75733271 - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.35643 Cum - - 3.4733 15.131188319 0.45 1.9603935 - - - - - - - - 0.36 1.5683148 0.54 2.3524722 0.041529 0.18091818147 - - 4.4196 19.253678028 - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.708072 Cum - - 3.4733 5.9326464776 0.45 0.7686324 - - - - - - - - 0.36 0.61490592 0.54 0.92235888 0.0741335 0.126625355612 - - - - 3.7695 6.438577404 - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404Bg) :.Reinforced cement concrete work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips(RCC Roof slab, lending, balcony, sun shed)(Nominal mix as per IS-456, Table-9). - Reinforced cement concrete work of M-20 grade with 20mm & downgrade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, lending, balcony, sun shed)(Nominal mix as per IS-456, Table-9). 8.5102075 Cum - - 3.4733 29.55850370975 0.45 3.829593375 - - - - - - - - 0.36 3.0636747 0.54 4.59551205 0.0502172 0.427358792069 - - 6.2216 52.947106982 - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 26 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 20.8 1.05 27.3 - - - - - - - - - -
12 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 120.4157 Sqm - - 0.043 5.1778751 0.018 2.1674826 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 143.4889 Sqm - - 0.0358 5.13690262 0.015 2.1523335 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 84.4555 Sqm - - 0.0372 3.1417446 0.0075 0.63341625 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 59.4192 Sqm - - 0.0858 5.09816736 0.012 0.7130304 - - - - - - - - - - - - - - - - - - - - - - - - 0.023 1.3666416 - - - - - - - -
16 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 523.37 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 43.96308 - - - - - -
17 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 148 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 37 - - - -
18 Painting(AR0901b) :.Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 35.9916 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 1.9435464 - -
19 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 8.175 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 1.021875
20 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 4.45 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 4.45 - - - - - - - - - -
Total Qty 22.0524 153.96897701245 30.356801275 10.393344 4344.42 18.28477 6399.6695 9.06642954 13.59964431 0.803461748101 3.23538831 72.20078501 6.438577404 20.8 31.75 1.3666416 43.96308 37 1.9435464 1.021875
Rate Per Unit 381.07 558.637 389.07 1700.92 5.411108 33 6.2128 2124.34 2087.96 58573.086 229.106 250.166 240.106 90.1 6537.707 1790.86 159.27787 70.34787 142.94787 205.58787
Total Amount 8403.508068 86012.767411304 11810.920672064 17678.24667648 23508.12581736 603.39741 39759.8666696 19260.178929004 28395.513333508 47061.23406923 741.24687415086 18062.181582812 1545.9410661648 1874.08 207572.19725 2447.463775776 7002.3457410396 2602.87119 277.82581812617 210.08510465625
Total Material Amount (in Rs.): 524829.99745928