State: Odisha District: Sonepur Block: Sonepur Gram Panchayat: Khaliapali
Work Code: OD/372/3570/121479/418945/00016431 (Improvement of road from Kudopali to Khaliapali)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Sonepur Proposal Date: -
Date of Commencement: 27-04-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: MISS MOHINI ORAM
Administrative Approval Details
Approval No.: OD/372/3570/121479/418945/00016431/AS
Technical Sanction Details
Technical Sanction No.: OD/372/3570/121479/418945/00016431/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 600000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0101a1) :.Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift - Earthwork in ordinary soil within 50m to 75m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 7.0335 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 34.6645 Cum 1 34.6645 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 46.387 Cum - - 2.29 106.22623 0.48 22.26576 0.96 44.53152 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 36.865 Cum - - 3.23 119.07395 0.45 16.58925 - - 0.9 33.1785 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 132.34 Sqm - - - - - - - - - - 0.00267 0.3533478 0.126 16.67484
Total Qty 34.6645 225.30018 38.85501 44.53152 33.1785 0.3533478 16.67484
Rate Per Unit 413.05 580.397 417.99 1726.96 2111.71 58668.206 324.226
Total Amount 14318.171725 130763.54857146 16241.0056299 76904.1537792 70063.370235 20730.281520047 5406.41667384
Total Material Amount (in Rs.): 334426.94813445