State: Odisha District: Cuttack Block: Niali Gram Panchayat: Niali
Work Code: OD/350/3341/117065/400347/00017316 (Improvement of road from PwD main road to Kuanri Sahi)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Niali Proposal Date: -
Date of Commencement: 08-05-2025 Date of Completion: 30-07-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: PRITI CHANDRIKA SAMAL
Administrative Approval Details
Approval No.: OD/350/3341/117065/400347/00017316/AS
Technical Sanction Details
Technical Sanction No.: OD/350/3341/117065/400347/00017316/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 450000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 0.243 Cum 2.29 0.55647 0.48 0.11664 0.96 0.23328 - - - - - -
2 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 55.115 Cum 3.23 178.02145 0.45 24.80175 - - 0.9 49.6035 - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 45.3 Sqm - - - - - - - - 0.00267 0.120951 0.126 5.7078
Total Qty 178.57792 24.91839 0.23328 49.6035 0.120951 5.7078
Rate Per Unit 569.712 548.19 2176.31 2604.91 58573.086 229.106
Total Amount 101737.98395904 13660.0122141 507.6895968 129212.653185 7084.473324786 1307.6912268
Total Material Amount (in Rs.): 253510.50350653