State: Odisha District: Kendujhar Block: Hatadihi Gram Panchayat: Samana
Work Code: OD/361/3449/119408/387210/00017583 (Renovation of Hanuman Tank at Chapundia Village)
Project Category: Water Body
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Hatadihi Proposal Date: 07-12-2024
Date of Commencement: 08-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Tank Project Type: New Work
Name of Executant: KSHETRAMOHAN MARNDI
Administrative Approval Details
Approval No.: OD/361/3449/119408/387210/00017583/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3449/119408/387210/00017583/TS
Fund Sanction No.: 28960
Fund Sanction Amount (in Rs.): 500000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 55.35 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 14.76 Cum 1 14.76 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 68.429 Cum - - 2.29 156.70241 0.48 32.84592 0.96 65.69184 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 188.6 Sqm - - - - - - - - 0.00267 0.503562 0.126 23.7636
Total Qty 14.76 156.70241 32.84592 65.69184 0.503562 23.7636
Rate Per Unit 786.71 592.307 731.61 1726.96 58573.086 229.106
Total Amount 11611.8396 92815.93435987 24030.4035312 113447.1800064 29495.180332332 5444.3833416
Total Material Amount (in Rs.): 276844.9211714