State: Odisha District: Balangir Block: Bangomunda Gram Panchayat: Jurabandh
Work Code: OD/345/3286/115815/421218/00022666 (Provision Of Facility Centre At Jurabandh GP Hqrs)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bangomunda Proposal Date: -
Date of Commencement: 25-08-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Facility Centre Project Type: New Work
Name of Executant: SINGRAI MURMU
Administrative Approval Details
Approval No.: OD/345/3286/115815/421218/00022666/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3286/115815/421218/00022666/TS
Fund Sanction No.: 13738
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM044 BRM340 BRM028 BRM079 BRM060 BRM052 BRM162 BRM341 BRM104 BRM092 BRM094 BRM084 BRMMR0025 BRM005 BRM131 BRMMR0027 BRM174 BRM129 BRM140 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 28.722296576 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 28.3132604 Cum 1 28.3132604 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0304) :.Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.2610484 Cum - - 0.96 13.690606464 1.72 24.529003248 0.48 6.845303232 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Stone Work (AR0717) :.Laterite stone masonry - Laterite stone masonry in cement mortar (1:6) in foundation and plinth cost conveyance, royalty, taxes of all materials, labor, required for the work, etc. complete and as per direction of the Engineer-in-charge. 13.9884992 Cum - - - - 0.572 8.0014215424 0.24 3.357239808 1 13.9884992 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 20.678944932 Cum - - - - 3.4733 71.824179432316 0.45 9.3055252194 - - 0.36 7.44442017552 0.54 11.16663026328 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 18.603 Qntl - - - - - - - - - - - - - - 0.8 14.8824 1.05 19.53315 - - - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 46.8509829 Sqm - - - - - - - - - - - - - - - - - - 0.00267 0.125092124343 0.126 5.9032238454 - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0410e) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 12.913517 Sqm - - - - - - - - - - - - - - - - - - 0.0052948717948718 0.068375416935897 - - 0.26923076923077 3.4767161153846 - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 40.9237715 Sqm - - - - - - - - - - - - - - - - - - 0.0051904761904762 0.21241386159524 - - - - 0.55238095238095 22.60551187619 - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 64.17274725 Sqm - - - - - - - - - - - - - - - - - - 0.0050222222222222 0.3222897973 - - - - 0.62222222222222 39.9297094 - - - - - - - - - - - - - - - -
11 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 24.098623284 Cum - - - - 0.672 16.194274846848 0.28 6.74761451952 - - - - - - - - - - - - - - - - - - 1 24.098623284 350 8434.5181494 - - - - - - - - - - - -
12 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 95.968799 Sqm - - - - 0.0358 3.4356830042 0.015 1.439531985 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 168.618945 Sqm - - - - 0.043 7.250614635 0.018 3.03514101 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Flooring (AR0817aa) :.Fifth Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 2.29934925 Sqm - - - - 0.1375 0.316160521875 0.015 0.03449023875 - - - - - - - - - - - - - - - - - - - - - - 1 2.29934925 1 2.29934925 - - - - - - - -
15 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 53.34583163 Sqm - - - - 0.1074 5.729342317062 0.021 1.12026246423 - - - - - - - - - - - - - - - - - - - - - - 1 53.34583163 - - 0.0076 0.405428320388 - - - - - -
16 Flooring (AR0817b) :.Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) - Fixing ceramic tiles (20cmx30cm / 20cmx20cm special plain/printed series ceramic wall tiles of premium grade having thickness 6.5mm to 6.7mm confirming to IS 13753) in wall cladding on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the ceramic tiles including rubbing and polishing, cost of precast tiles complete as per direction of Engineer-in-charge. 29.60261192 Sqm - - - - 0.1375 4.070359139 0.015 0.4440391788 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 29.60261192 - - - -
17 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 5.6175 Qntl - - - - - - - - - - - - - - - - 1 5.6175 - - - - - - - - - - - - - - - - - - - - - - - -
18 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 169.176363 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 21.147045375 - -
19 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 96.526217 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 7.239466275
Total Qty 28.3132604 13.690606464 141.3510386867 32.3291476557 13.9884992 7.44442017552 11.16663026328 14.8824 25.15065 0.72817120017414 5.9032238454 3.4767161153846 62.53522127619 24.098623284 8434.5181494 55.64518088 2.29934925 0.405428320388 29.60261192 21.147045375 7.239466275
Rate Per Unit 347.95 1271.26 572.212 352.89 1038.56 1676.01 1658.3 90 6598.192 58620.646 276.666 287.666 297.726 33 6.1539 662.3175001 8.5 2047.912 416.4375001 249.64732 195.09732
Total Amount 9851.59895618 17404.320373425 80882.760548994 11408.63291622 14527.895729152 12476.922658373 18517.622965597 1339.416 165948.8176248 42685.866152803 1633.2213284114 1000.1330180482 18618.361289675 795.254568372 51905.181239593 36854.777093054 19.544468625 830.28152246243 12327.637704395 5279.3032037871 1412.4004684829
Total Material Amount (in Rs.): 505719.94983045