State: Odisha District: Mayurbhanj Block: Joshipur Gram Panchayat: Matiagarh
Work Code: OD/365/3496/120185/388559/00025400 (Imp. of Road with CC/ Gr-II Metalling at Singarpur)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Joshipur Proposal Date: -
Date of Commencement: 27-10-2025 Date of Completion: 20-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: TAPAN KUMAR NAIK
Administrative Approval Details
Approval No.: OD/365/3496/120185/388559/00025400/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3496/120185/388559/00025400/TS
Fund Sanction No.: 1130
Fund Sanction Amount (in Rs.): 600000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092 BRMM402 BRMM401
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 7.0721208 Cum - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 37.340797824 Cum 1 37.340797824 - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 42.008397552 Cum - - 2.29 96.19923039408 0.48 20.16403082496 0.96 40.32806164992 - - - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 32.814640512 Cum - - 3.23 105.99128885376 0.45 14.7665882304 - - 0.9 29.5331764608 - - - - - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 77.3417475 Sqm - - - - - - - - - - 0.00267 0.206502465825 0.126 9.745060185 - - - -
6 Earth Work (AR0122Bii) :.Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. 15.652960704 Cum - - - - - - - - - - - - - - -0.6666 -10.434263605286 1 15.652960704
Total Qty 37.340797824 202.19051924784 34.93061905536 40.32806164992 29.5331764608 0.206502465825 9.745060185 -10.434263605286 15.652960704
Rate Per Unit 336.44 644.787 928.76 1726.96 2128.33 58573.086 229.106 175.38 276.01
Total Amount 12562.938019907 130369.81833426 32442.161753856 69644.949346946 62856.345456814 12095.48668998 2232.6517587446 -1829.9611510951 4320.373683911
Total Material Amount (in Rs.): 324694.76389332