State: Odisha District: Kalahandi Block: Kokasara Gram Panchayat: Ladugaon
Work Code: OD/358/3417/118780/424064/00027438 (Development Of Ladugaon Weekly Market)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Kokasara Proposal Date: -
Date of Commencement: 12-12-2025 Date of Completion: 29-12-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Development of Rural Haat
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Ajay Kumar Senapati
Administrative Approval Details
Approval No.: OD/358/3417/118780/424064/00027438/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3417/118780/424064/00027438/TS
Fund Sanction No.: 12430
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM060 BRM052 BRM104 BRM092 BRM084 BRM001 BRM056 BRM162 BRM341 BRM253 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 65.3688 Cum 1 65.3688 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 50.76 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.202 Cum - - 2.29 32.52258 0.48 6.81696 0.96 13.63392 - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 32.2071875 Cum - - 3.4733 111.86522434375 0.45 14.493234375 - - 0.36 11.5945875 0.54 17.39188125 - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.8 Sqm - - - - - - - - - - - - 0.00267 0.044856 0.126 2.1168 - - - - - - - - - - - - - -
6 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 113.3125 Sqm - - - - - - - - - - - - 0.0051904761904762 0.58814583333333 - - 0.55238095238095 62.591666666667 - - - - - - - - - - - -
7 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 89.1075 Sqm - - - - - - - - - - - - 0.0050222222222222 0.44751766666667 - - 0.62222222222222 55.444666666667 - - - - - - - - - - - -
8 Masonry Brick Work (AR0603d) :.C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 22.83406 Cum - - 0.672 15.34448832 0.28 6.3935368 - - - - - - - - - - - - 350 7991.921 - - - - - - - - - -
9 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 171.285 Sqm - - 0.0372 6.371802 0.0075 1.2846375 - - - - - - - - - - - - - - - - - - - - - - - -
10 Flooring (AR0802i) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 92.3375 Sqm - - 0.0858 7.9225575 0.012 1.10805 - - - - - - - - - - - - - - 0.023 2.1237625 - - - - - - - -
11 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 31.2 Qntl - - - - - - - - - - - - - - - - - - - - - - 0.8 24.96 1.05 32.76 - - - -
12 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 45 Sqm - - 0.043 1.935 0.018 0.81 - - - - - - - - - - - - - - - - - - - - - - - -
13 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 216.28 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 18.16752 - -
14 Painting(AR0918Ai) :.Finishing wall one coat with weather coat - Finishing wall one coat with weather coat including all costs of labour, Paint, Primer and Brushes required for the work etc. complete and as per direction of Engineer-in-charge. 216.28 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 16.221
15 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 101.6075 Sqm - - 0.0744 7.559598 0.021 2.1337575 - - - - - - - - - - - - - - - - - - - - - - - -
Total Qty 65.3688 183.52125016375 33.040176175 13.63392 11.5945875 17.39188125 1.0805195 2.1168 118.03633333333 7991.921 2.1237625 24.96 32.76 18.16752 16.221
Rate Per Unit 478.15 608.232 483.09 1193.57 1801.21 1786.21 58668.206 324.226 345.286 5.39061 1802.83 90.1 6206.132 159.33732 189.80732
Total Amount 31256.09172 111623.4970296 15961.378708381 16273.0378944 20884.286950875 31065.552207563 63392.140613017 686.3215968 40756.293391333 43081.32926181 3828.782747875 2248.896 203312.88432 2894.7639478464 3078.86453772
Total Material Amount (in Rs.): 590344.12092722