State: Odisha District: Khordha Block: Bolagarh Gram Panchayat: Gediapalli
Work Code: OD/362/3461/119626/407159/00027702 (Development Of Rural Haat, Gediapalli)
Project Category: Other Infrastructure
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Bolagarh Proposal Date: -
Date of Commencement: 07-11-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Development of Rural Haat
Project Sub-Category: Rural Haat Project Type: New Work
Name of Executant: SONALI MALLICK
Administrative Approval Details
Approval No.: OD/362/3461/119626/407159/00027702/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3461/119626/407159/00027702/TS
Fund Sanction No.: 15597
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM084 BRM162 BRM341 BRM060 BRM052 BRM005 BRMMR0025 BRM253 BRM142 BRM255 BRM056 BRM025
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 39.06 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 32.562 Cum 1 32.562 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 14.625 Cum - - 2.29 33.49125 0.48 7.02 0.96 14.04 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 53.82 Sqm - - 0.0358 1.926756 0.015 0.8073 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 40.545 Sqm - - 0.043 1.743435 0.018 0.72981 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 27.54 Sqm - - - - - - - - 0.00267 0.0735318 0.126 3.47004 - - - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 120.96 Sqm - - - - - - - - 0.0051904761904762 0.62784 - - 0.55238095238095 66.816 - - - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 84.945 Sqm - - - - - - - - 0.0050222222222222 0.42661266666667 - - 0.62222222222222 52.854666666667 - - - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 29.56 Qntl - - - - - - - - - - - - - - 0.8 23.648 1.05 31.038 - - - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 32.1345 Cum - - 3.4733 111.61275885 0.45 14.460525 - - - - - - - - - - - - 0.36 11.56842 0.54 17.35263 - - - - - - - - - - - - - -
11 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 10.25325 Cum - - 0.672 6.890184 0.28 2.87091 - - - - - - - - - - - - - - - - 350 3588.6375 - - - - - - - - - - - -
12 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 7.155 Cum - - 0.672 4.80816 0.28 2.0034 - - - - - - - - - - - - - - - - 350 2504.25 1 7.155 - - - - - - - - - -
13 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 249.83 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 20.98572 - - - - - - - -
14 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 249.83 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 62.4575 - - - - - -
15 Painting(AR0918cb) :.Finishing wall two coats with weather coat with one coat waterbound Primer - Finishing wall two coats with weather coat with one coat waterbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 53.82 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.090322580645161 4.8611612903226 - - 0.125 6.7275 - - - -
16 Flooring (AR0802i) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 96.39 Sqm - - 0.0858 8.270262 0.012 1.15668 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.023 2.21697 - -
17 Road Work (AR1307) :.Supplying & spreading moorum and consolidation with HRR - Supplying & spreading moorum and consolidation with HRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. 4.5 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.28 5.76
Total Qty 32.562 168.74280585 29.048625 14.04 1.1279844666667 3.47004 119.67066666667 23.648 31.038 11.56842 17.35263 6092.8875 7.155 25.846881290323 62.4575 6.7275 2.21697 5.76
Rate Per Unit 1010.1 575.332 1016.49 1726.96 58620.646 276.666 297.726 90.1 6685.862 2129.38 2114 6.59565 33 154.57732 70.40732 193.13732 2104.42 662.76
Total Amount 32890.8762 97083.135975292 29527.63682625 24246.5184 66123.178113965 960.04208664 35629.068904 2130.6848 207515.784756 24633.5621796 36683.45982 40186.553439375 236.115 3995.3416402162 4397.4651889 1299.3313203 4665.4360074 3817.4976
Total Material Amount (in Rs.): 616021.68825794