State: Odisha District: Kendrapara Block: Garadapur Gram Panchayat: Garadapur
Work Code: OD/360/3436/119081/396806/00029103 (Repair& maintenance of C C road from Budhi jagulai to Veterinary Hospital, Garadpur)
Project Category: Road
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Garadapur Proposal Date: -
Date of Commencement: 10-11-2025 Date of Completion: 25-11-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant: Priyabrata Das JE
Administrative Approval Details
Approval No.: OD/360/3436/119081/396806/00029103/AS
Technical Sanction Details
Technical Sanction No.: OD/360/3436/119081/396806/00029103/TS
Fund Sanction No.: 29781
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.5125 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.1765 Cum 1 13.1765 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 17.689 Cum - - 2.29 40.50781 0.48 8.49072 0.96 16.98144 - - - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 19.855 Sqm - - - - - - - - 0.00267 0.05301285 0.126 2.50173 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 9.882375 Cum - - 3.23 31.92007125 0.45 4.44706875 - - - - - - 0.9 8.8941375
Total Qty 13.1765 72.42788125 12.93778875 16.98144 0.05301285 2.50173 8.8941375
Rate Per Unit 340.19 605.327 347.82 2210.75 58573.086 229.106 2654.13
Total Amount 4482.513535 43842.552073419 4500.021683025 37541.71848 3105.1262221551 573.16135338 23606.197162875
Total Material Amount (in Rs.): 117651.29050985