State: Odisha District: Kalahandi Block: Kalampur Gram Panchayat: Hermal
Work Code: OD/358/3414/118725/424166/00031653 (Const. of C.C.road from PMGSY road to Sargipada)
Project Category: Road
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Kalampur Proposal Date: 15-12-2024
Date of Commencement: 01-12-2025 Date of Completion: 17-12-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: PITAMBAR HEMBRUM
Administrative Approval Details
Approval No.: OD/358/3414/118725/424166/00031653/AS
Technical Sanction Details
Technical Sanction No.: OD/358/3414/118725/424166/00031653/TS
Fund Sanction No.: 28992
Fund Sanction Amount (in Rs.): 210000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.88 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 15.78 Cum 1 15.78 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 18.62 Cum - - 2.29 42.6398 0.48 8.9376 0.96 17.8752 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 12.462 Cum - - 3.23 40.25226 0.45 5.6079 - - 0.9 11.2158 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 14.7 Sqm - - - - - - - - - - 0.00267 0.039249 0.126 1.8522
Total Qty 15.78 82.89206 14.5455 17.8752 11.2158 0.039249 1.8522
Rate Per Unit 413.05 614.177 417.99 1596.76 1998.13 58858.446 514.466
Total Amount 6517.929 50910.39673462 6079.873545 28542.404352 22410.626454 2310.135147054 952.8939252
Total Material Amount (in Rs.): 117724.25915787