| State: Odisha |
District: Khordha |
Block: Khordha |
Gram Panchayat: Barasahi |
Work Code: OD/362/3464/275250/407308/00032314 (Const Of Metal Morrum Road From Prafful Samantaray House To Nityananda Sundaray House,Kumbhilo)
Project Category: Road
| Financial Year: 2023-24 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Khordha |
Proposal Date: - |
| Date of Commencement: 15-09-2025 |
Date of Completion: - |
| Scheme Name: 5th SFC Grant in Aid |
Scheme Component Name: All Weather Connectivity |
| Project Sub-Category: Mettalling Road |
Project Type: New Work |
| Name of Executant: SUBHASMITA SAHOO |
|
Administrative Approval Details
Approval No.: OD/362/3464/275250/407308/00032314/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3464/275250/407308/00032314/TS
Fund Sanction No.: 15598
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM025 |
BRM029 |
BRMMR0037 |
BRM076 |
BRM026 |
BRMM402 |
BRMM401 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0110) :.Fine dressing of earth work in ordinary or hard soil in road formation - Fine dressing of earth work in ordinary or hard soil in road formaton according to the direction of the department including cutting or filling earth upto 0.15m depth of surface. |
989.41695 |
Sqm |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Road Work (AR1308) :.moorum and sand admixture laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR - Supplying & spreading moorum and sand admixture in a ratio (70:30) laying in sub-base in layers not exceeding 100mm watering and compacting to the required density in O.M.C with PRR including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and complete as per direction of Engineer-in-Charge. |
100.52464 |
Cum |
0.89578798586572 |
90.048764795477 |
0.384 |
38.60146176 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Road Work (AR1313) :.Supplying & spreading with sand 6mm thick for road binding in road surface - Supplying & spreading with sand 6mm thick for road binding in road surface including cost, conveyance, royalty, taxes cost of all labour & material, hire charges of T & P materials required for work as per specification and direction of Engineer-in-Charge. |
659.6113 |
Sqm |
- |
- |
0.006 |
3.9576678 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Road Work (AR1341d) :.Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam - Providing, laying, spreading and compacting Grading-II stone aggregates of specific sizes using stone screened dust to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density as per Clause 404 of MoRT&H Specifications for Road & Bridge works(Last Revision). |
66.3462624 |
Cum |
- |
- |
- |
- |
0.4 |
26.53850496 |
1.21 |
80.278977504 |
0.34669444444444 |
23.001880583733 |
- |
- |
- |
- |
| 5 |
Earth Work (AR0122Bii) :.Earthwork in hard soil or gravelly soil within 5 Km. mechanical carriages and spreading in filling area/road berm within initial lead and lift - Earthwork in hard soil or gravelly soil within 5 Km.mechanical carriages and spreading in filling area/road berm within initial lead and lift including dressing and leveling the bed, etc. as per direction of Engineer-in-Charge. |
30.157392 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
-0.6666 |
-20.1029175072 |
1 |
30.157392 |
| 6 |
Road Work (AR1306) :.Labour for admixture of sand and moorum - Labour for admixture of sand and moorum including labour cost, for work as per specification and direction of Engineer-in-Charge. |
100.52464 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| Total Qty |
90.048764795477 |
42.55912956 |
26.53850496 |
80.278977504 |
23.001880583733 |
-20.1029175072 |
30.157392 |
| Rate Per Unit |
532.56 |
853 |
10 |
867.3 |
672.74 |
175.38 |
276.01 |
| Total Amount |
47956.370179479 |
36302.93751468 |
265.3850496 |
69625.957189219 |
15474.285143901 |
-3525.6496724127 |
8323.74176592 |
Total Material Amount (in Rs.): 174423.02717039