State: Odisha District: Kandhamal Block: K.Nuagan Gram Panchayat: Kanjamendi
Work Code: OD/359/3426/118922/416867/00034158 (CONSTRUCTION OF STAFF QUARTER AT KNUAGAON 9 LAKHS EACH )
Project Category: Building
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, K.Nuagan Proposal Date: 22-03-2021
Date of Commencement: 16-07-2025 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: GP Bhawan Project Type: New Work
Name of Executant: Prakash Ch Sethy
Administrative Approval Details
Approval No.: OD/359/3426/118922/416867/00034158/AS
Technical Sanction Details
Technical Sanction No.: OD/359/3426/118922/416867/00034158/TS
Fund Sanction No.: 98
Fund Sanction Amount (in Rs.): 900000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM162 BRM341 BRMMR0025 BRM005 BRM084 BRM104 BRM094 BRM150
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404A) :.First floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 22.0648802118 Cum 3.4733 76.637948439645 0.45 9.92919609531 0.36 7.943356876248 0.54 11.915035314372 - - - - - - - - - - - - - - - -
2 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 12.8981653763 Cum 3.4733 44.799197801503 0.45 5.804174419335 0.36 4.643339535468 0.54 6.965009303202 - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 19.9 Qntl - - - - - - - - 0.8 15.92 1.05 20.895 - - - - - - - - - - - -
4 Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 39.0587013092 Cum 0.672 26.247447279782 0.28 10.936436366576 - - - - - - - - 1 39.0587013092 350 13670.54545822 - - - - - - - -
5 R.C.C. Work (AR0410d) :.First floor - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 77.975657816 Sqm - - - - - - - - - - - - - - - - 0.66285714285714 51.68672175232 0.0062285714285714 0.4856769543968 - - - -
6 R.C.C. Work (AR0410e) :.First floor - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 23.5050432 Sqm - - - - - - - - - - - - - - - - - - 0.0063538461538462 0.14934742833231 0.32307692307692 7.5939370338462 - -
7 R.C.C. Work (AR0410a) :.First floor - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 84.866316964 Sqm - - - - - - - - - - - - - - - - 0.74666666666667 63.366849999787 0.0060266666666667 0.51146100356971 - - - -
8 R.C.C. Work (AR0410b) :.First floor - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. stairs excluding landing but including railing details for 5 Sqm 14.75886605872 Sqm - - - - - - - - - - - - - - - - - - 0.006408 0.094574813704278 0.156 2.3023831051603 - -
9 Roofing (AR1132i) :.Supplying, feeting & fixing of G.C.I. Sheet (0.40mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.40mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 10.795555334803 Sqm - - - - - - - - - - - - - - - - - - - - - - 1 10.795555334803
10 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.89485 Qntl - - - - - - - - - - 1 2.89485 - - - - - - - - - - - -
11 Iron Work(AR1703) :.Iron work wrought and put up in trusses and record racks - Iron work wrought and put up in trusses and record racks including all cost of labour, material, machinery and T & P required for the work etc. as per direction of Engineer-in-Charge. 0.297208 Qntl - - - - - - - - - - 1 0.297208 - - - - - - - - - - - -
Total Qty 147.68459352093 26.669806881221 12.586696411716 18.880044617574 15.92 24.087058 39.0587013092 13670.54545822 115.05357175211 1.2410602000031 9.8963201390065 10.795555334803
Rate Per Unit 557.587 1214.79 2372.58 2336.2 90.1 6712.107 33 6.70035 250.166 58573.086 240.106 330.8154923
Total Amount 82347.009447555 32398.214701238 29862.944172509 44107.560235576 1434.392 161674.91061121 1288.9371432036 91597.439260984 28782.491830938 72692.725825958 2376.1658432963 3571.3369527347
Total Material Amount (in Rs.): 552134.1280252