State: Odisha District: Gajapati Block: Rayagad Gram Panchayat: Dambala
Work Code: OD/353/3363/117548/414749/00034803 (Improvement of Govt. UP School Dambalo)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Rayagad Proposal Date: -
Date of Commencement: 19-11-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Upgradation or Improvement
Name of Executant: Janemejay Mohanta
Administrative Approval Details
Approval No.: OD/353/3363/117548/414749/00034803/AS
Technical Sanction Details
Technical Sanction No.: OD/353/3363/117548/414749/00034803/TS
Fund Sanction No.: 3809
Fund Sanction Amount (in Rs.): 600000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM060 BRM052 BRM162 BRM341 BRM006 BRM084 BRM104 BRM094 BRM174 BRM131 BRMMR0027 BRMM105 BRM137 BRMMR0038 BRM140 BRM142 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 R.C.C. Work (AR0404A) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. (excluding centring and shuttering) 8.97475 Cum 3.4733 31.171999175 0.45 4.0386375 0.36 3.23091 0.54 4.846365 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 9.5 Qntl - - - - - - - - 0.8 7.6 1.05 9.975 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 40.8 Sqm 0.0744 3.03552 0.021 0.8568 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 15.9201 Cum 0.672 10.6983072 0.28 4.457628 - - - - - - - - 400 6368.04 - - - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0410d) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. beams, column, grider and bressmer, etc. Data for 4.2sqm 30.3475 Sqm - - - - - - - - - - - - - - 0.55238095238095 16.763380952381 0.0051904761904762 0.15751797619048 - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0410e) :.Rigid and smooth centering and shuttering for R.C.C. works including false works and dismantling them after casting - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. Lintels Data for 7.8 sqm 8.004 Sqm - - - - - - - - - - - - - - - - 0.0052948717948718 0.042380153846154 0.26923076923077 2.1549230769231 - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0410a) :.Centring & Shuttering for R.C.C. floor and roof slabs, landings,balconies, projecting sun shades and chajjas - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. floor and roof slabs, landings, balconies, projecting sun shades and chajjas up to 4.3m height 50.206 Sqm - - - - - - - - - - - - - - 0.62222222222222 31.239288888889 0.0050222222222222 0.25214568888889 - - - - - - - - - - - - - - - - - - - - - -
8 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 81.9 Sqm 0.043 3.5217 0.018 1.4742 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
9 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 86.96 Sqm 0.0358 3.113168 0.015 1.3044 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 82.3075 Sqm 0.1074 8.8398255 0.021 1.7284575 - - - - - - - - - - - - - - - - 0.0076 0.625537 1 82.3075 - - - - - - - - - - - - - - - -
11 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 10.41 Sqm 0.1375 1.431375 0.015 0.15615 - - - - - - - - - - - - - - - - - - 1 10.41 1 10.41 - - - - - - - - - - - - - -
12 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 0.07065 Qntl - - - - - - - - - - 1 0.07065 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 miscellaneous(ARM105) :.Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. 7.065 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 1 7.065 - - - - - - - - - - - -
14 Painting(AR0901b) :.Priming one coat in inner surface with primer of approved quality over iron work. - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 42.705 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 2.30607 - - - - - - - - - -
15 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 47.85 Sqm 0.0372 1.78002 0.0075 0.358875 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 129.75 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.8 103.8 - - - - - - - -
17 Painting(AR0920) :.Finishing wall two coats with plastic emulsion paint of approved shades on new work (Inside) - Finishing wall two coats with plastic emulsion paint of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 129.75 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 16.21875 - - - - - -
18 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 187.1125 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 46.778125 - - - -
19 Painting(AR0917g) :.Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work (Outside) - Finishing wall with one coat weather coat paint of approved shade including one coat of oil bound primer in the outer surface of old work to give an even shade including all costs of labour, Paint, Brushes, and putty required for the work, etc. complete and as per direction of Engineer-in-charge. (Outside) 192.4455 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.075 14.4334125 0.084 16.165422
Total Qty 63.591914875 14.375148 3.23091 4.846365 7.6 10.04565 6368.04 48.00266984127 0.45204381892552 2.1549230769231 0.625537 92.7175 10.41 7.065 2.30607 103.8 16.21875 46.778125 14.4334125 16.165422
Rate Per Unit 807.512 1030.79 2372.58 2336.2 90.1 6436.342 5.36398 297.726 58620.646 287.666 2071.692 668.8630561 8.5 16.22 143.24512 30 249.88512 70.64512 195.33512 126.04512
Total Amount 51351.234364541 14817.75880692 7665.5924478 11322.077913 684.76 64657.2390123 34158.0391992 14291.642881162 26499.100685721 619.89810184615 1295.919998604 62015.310403952 88.485 114.5943 330.3332738784 3114 4052.82429 3304.646254 2819.352362697 2037.5725558406
Total Material Amount (in Rs.): 305240.38185146