State: Odisha District: Kendujhar Block: Saharapada Gram Panchayat: Silipada
Work Code: OD/361/3454/119510/385861/00035979 (Maintenance Of Begana Hata Pindi)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Saharapada Proposal Date: -
Date of Commencement: 03-02-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: Narayan Behera
Administrative Approval Details
Approval No.: OD/361/3454/119510/385861/00035979/AS
Technical Sanction Details
Technical Sanction No.: OD/361/3454/119510/385861/00035979/TS
Fund Sanction No.: 11826
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM057 BRM005 BRM149
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 17.91568681584 Cum - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 45.872432927213 Cum 1 45.872432927213 - - - - - - - - - - - - - -
3 Concrete (AR0304a) :.Cement concrete (1:4:8) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.742167062406 Cum - - 1.72 27.076527347338 0.48 7.5562401899549 0.96 15.11248037991 - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 1.8760163168 Cum - - 3.23 6.059532703264 0.45 0.84420734256 - - 0.9 1.68841468512 - - - - - -
5 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 101.8101308668 Sqm - - 0.0858 8.7353092283714 0.012 1.2217215704016 - - - - 0.023 2.3416330099364 - - - -
6 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 20.5608709552 Cum - - 0.672 13.816905281894 0.28 5.757043867456 - - - - - - 350 7196.30483432 - -
7 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 38.76656384 Sqm - - 0.0358 1.387842985472 0.015 0.5814984576 - - - - - - - - - -
8 Roofing (AR1132) :.Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 13.00642 Sqm - - - - - - - - - - - - - - 1 13.00642
Total Qty 45.872432927213 57.07611754634 15.960711427972 15.11248037991 1.68841468512 2.3416330099364 7196.30483432 13.00642
Rate Per Unit 721.61 616.087 731.61 1481.71 2101.71 1816.9 6.59565 318.762742
Total Amount 33102.006324606 35163.854030772 11677.016087819 22392.313303716 3548.5580278636 4254.5130157534 47464.307980483 4145.9621028036
Total Material Amount (in Rs.): 161748.53087382