State: Odisha District: Malkangiri Block: Khairaput Gram Panchayat: Govindapalli
Work Code: OD/364/3481/119952/430374/00038295 (Provision of Facility Centre at Govindapally)
Project Category: Building
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Khairaput Proposal Date: -
Date of Commencement: 01-08-2025 Date of Completion: 22-09-2025
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Facility Centre Project Type: New Work
Name of Executant: SAMIR DAS
Administrative Approval Details
Approval No.: OD/364/3481/119952/430374/00038295/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3481/119952/430374/00038295/TS
Fund Sanction No.: 28001
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRM001 BRM174 BRM131 BRM142 BRM341 BRM141 BRM064 BRM162 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 32.022 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 28.37488 Cum 1 28.37488 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0304a) :.Cement concrete (1:4:8) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 27.08231 Cum - - 1.72 46.5815732 0.48 12.9995088 0.96 25.9990176 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 6.92436 Cum - - 3.4733 24.050379588 0.45 3.115962 - - 0.36 2.4927696 0.54 3.7391544 0.004005 0.0277320618 0.189 1.30870404 - - - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 2.327071 Cum - - 3.4733 8.0826157043 0.45 1.04718195 - - 0.36 0.83774556 0.54 1.25661834 0.01335 0.03106639785 0.63 1.46605473 - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.890467 Cum - - 3.4733 16.9860590311 0.45 2.20071015 - - 0.36 1.76056812 0.54 2.64085218 0.041529 0.203096204043 - - 4.4196 21.6139079532 - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.72523 Cum - - 3.4733 5.992241359 0.45 0.7763535 - - 0.36 0.6210828 0.54 0.9316242 0.0741335 0.127897338205 - - - - 3.7695 6.503254485 - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.18928 Cum - - 3.4733 28.443826224 0.45 3.685176 - - 0.36 2.9481408 0.54 4.4222112 0.0502172 0.411242711616 - - 6.2216 50.950424448 - - - - - - - - - - - - - - - - - - - - - -
9 Masonry Brick Work (AR0602d) :.C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in foundation and plinth - Brickwork with C.B. Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 22.107701 Cum - - 1 22.107701 0.28 6.19015628 - - - - - - - - - - - - - - 350 7737.69535 - - - - - - - - - - - - - - - - - -
10 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 102.48 Sqm - - 0.0358 3.668784 0.015 1.5372 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
11 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 129.18 Sqm - - 0.043 5.55474 0.018 2.32524 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
12 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 20.52 Sqm - - 0.0744 1.526688 0.021 0.43092 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Other Building Items. (AR1901B) :.Vitrified Tile 600mmx600mm Plain Ivory - Supplying, fitting & fixing Vitrified Tile 600mmx600mm Plain Ivory in floors of size 600mm x 600 mm of approved make conforming IS:13755 laid on 20 mm thick cement mortar(1:4)and filling joints with white cement of approved quality including cost of all materials, taxes, labour, T&P , etc. required for the work all complete as per direction of Engineer-in-charge(for new work only) 79.1415 Sqm - - 0.1074 8.4997971 0.021 1.6619715 - - - - - - - - - - - - - - - - 0.0076 0.6014754 1 79.1415 - - - - - - - - - - - - - -
14 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 191.7245 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 47.931125 - - - - - - - - - - - -
15 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 2.091 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 2.091 - - - - - - - - - -
16 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 18.045 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 2.255625 - - - - - - - -
17 Concrete (AR0317) :.2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 77.064 Sqm - - 0.1208 9.3093312 0.0169 1.3023816 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.0169 1.3023816 - - - - - -
18 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 24.046 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.05 25.2483 - - - - 0.8 19.2368 - - - -
19 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 123 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 15.375 0.084 10.332
Total Qty 28.37488 180.8037364064 37.27276178 25.9990176 8.66030688 12.99046032 0.801034713514 2.77475877 72.5643324012 6.503254485 7737.69535 0.6014754 79.1415 47.931125 27.3393 2.255625 1.3023816 19.2368 15.375 10.332
Rate Per Unit 543.25 567.102 548.19 1193.57 2326.58 2290.2 58573.086 229.106 250.166 240.106 5.39061 2047.912 676.7250011 70.40732 6621.332 205.64732 1758.11 90.1 195.09732 125.80732
Total Amount 15414.65356 102534.16052354 20432.555280178 31031.647436832 20148.89678087 29750.752224864 46919.075163641 635.71388275962 18153.128779479 1561.4704213754 41710.897930664 1231.7686893648 53557.031674556 3374.702055835 181022.5819476 463.863236175 2289.730114776 1733.23568 2999.621295 1299.84123024
Total Material Amount (in Rs.): 576265.32790775