State: Odisha District: Sambalpur Block: Rairakhol Gram Panchayat: Rengali
Work Code: OD/371/3565/121408/382348/00038326 (Construction of CC Road at Tutamunda Village Road )
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Rairakhol Proposal Date: -
Date of Commencement: 30-12-2025 Date of Completion: 08-01-2026
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: Sanghamitra Seth
Administrative Approval Details
Approval No.: OD/371/3565/121408/382348/00038326/AS
Technical Sanction Details
Technical Sanction No.: OD/371/3565/121408/382348/00038326/TS
Fund Sanction No.: 28788
Fund Sanction Amount (in Rs.): 500000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 58.70720057772 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 36.55201813279 Cum 1 36.55201813279 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 45.912673383985 Cum - - 2.29 105.14002204933 0.48 22.038083224313 0.96 44.076166448626 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 29.00312528886 Cum - - 3.23 93.680094683018 0.45 13.051406379987 - - 0.9 26.102812759974
Total Qty 36.55201813279 198.82011673234 35.0894896043 44.076166448626 26.102812759974
Rate Per Unit 476.21 598.457 483.09 1486.41 1933.03
Total Amount 17406.436555016 118985.29059929 16951.381532941 65515.254570902 50457.520149413
Total Material Amount (in Rs.): 269315.88340756