State: Odisha District: Sambalpur Block: Naktideul Gram Panchayat: Panimura
Work Code: OD/371/3564/121391/382100/00038399 (MAINTENANCE OF PANIMURA MARKET COMPLEX)
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Naktideul Proposal Date: -
Date of Commencement: - Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Capital Assets
Project Sub-Category: Market Complex Project Type: Repair and Maintenance
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 26956
Fund Sanction Amount (in Rs.): 400000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRMMR0025 BRM340 BRM028 BRM005 BRM044 BRM132 BRMMR0027 CON026 BRM149 BRM056 BRM131 BRMMR0038 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 2.68443264 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.0567681536 Cum 1 10.0567681536 - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Masonry Brick Work (AR0602bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:4) in superstructure having crushing strength not less than 75.00 Kg/cm2 immerging the with dimensional tolerance ±8 percent immersing in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 1.7806736512 Cum - - 1 1.7806736512 1 1.7806736512 0.28 0.498588622336 350 623.23577792 - - - - - - - - - - - - - - - - - - - -
4 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 60.899310045 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Concrete (AR0304) :.Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 5.30090496 Cum - - - - 1.72 9.1175565312 0.48 2.5444343808 - - 0.96 5.0888687616 - - - - - - - - - - - - - - - - - -
6 Flooring (AR0817ab) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm Coloured /Printed series(Homogeneous) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm Coloured /Printed series(Homogeneous) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 91.516422725 Sqm - - - - 0.1375 12.583508124688 0.015 1.372746340875 - - - - 1 91.516422725 1 91.516422725 0.1375 12.583508124688 - - - - - - - - - - - -
7 Roofing (AR1132) :.Supplying, feeting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties - Supplying, fitting & fixing of G.C.I. Sheet (0.30mm thick) in roof drilling hole in wind ties including fixing of ridges valleys wind ties etc. including cost of fitting, Labour and material etc. complete as per direction of Engineer-in-Charge 20.43866 Sqm - - - - - - - - - - - - - - - - - - 1 20.43866 - - - - - - - - - -
8 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 23.17091819328 Cum - - - - 2.29 53.061402662611 0.48 11.122040732774 - - 0.96 22.244081465549 - - - - - - - - - - - - - - - - - -
9 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 4.94064730368 Cum - - - - 3.23 15.958290790886 0.45 2.223291286656 - - - - - - - - - - - - 0.9 4.446582573312 - - - - - - - -
10 Flooring (AR0817aa) :.Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm plain (Ivory) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. 3.67431365 Sqm - - - - 0.1375 0.505218126875 0.015 0.05511470475 - - - - - - 1 3.67431365 - - - - - - 1 3.67431365 - - - - - -
11 Other Building Items. (AR1902) :.cement based wall putty (water based) - Finishing surface of walls with cement based wall putty (water based) of approved make and finished smooth and even surface to receive painting including cost of scaffolding staging charges with cost of all materials taxes,labour,T&P,etc.complete. and as per the direction of Engineer in Charge. 0.092903 Sqm - - - - - - - - - - - - - - - - - - - - - - - - 0.8 0.0743224 - - - -
12 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 0.092903 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 0.011612875 0.084 0.007803852
Total Qty 10.0567681536 1.7806736512 93.00664988746 17.816216068191 623.23577792 27.332950227149 91.516422725 95.190736375 12.583508124688 20.43866 4.446582573312 3.67431365 0.0743224 0.011612875 0.007803852
Rate Per Unit 372.05 33 614.347 873.69 7.0421 1746.81 714.6922231 8.5 0 318.608172 2193.43 672.6922231 30 195.33512 126.04512
Total Amount 3741.6205915469 58.7622304896 57138.356338411 15565.849816618 4388.8886716904 47745.470786286 65406.07560749 809.1212591875 0 6511.9241007295 9753.2676137797 2471.6822175852 2.229672 2.26840233167 0.98363746180224
Total Material Amount (in Rs.): 213596.50094561