State: Odisha District: Malkangiri Block: Korukonda Gram Panchayat: Mariwada
Work Code: OD/364/3482/119971/430325/00039504 (Repair and maintenance of Primary School building a MPV-18(B))
Project Category: Building
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Korukonda Proposal Date: -
Date of Commencement: - Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance of Primary School Building
Project Sub-Category: Elementary School Project Type: Repair and Maintenance
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 27871
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRMMR0025 BRM005 BRMMR0036 BRM150 BRM044 BRM142 BRM057 BRM255 BRM252
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1603) :.Dismantling brick or stone masonry under 3m. - Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead and as per direction of Engineer-in-Charge. 0.7038 Cum - - - - - - - - - - - - - - - - - - - - - -
2 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 34.8 Sqm - - - - - - - - - - - - - - - - - - - - - -
3 Dismantling (AR1613) :.Removing old lime or cement plaster - Removing old lime or cement plaster from walls including raking out joints 12 mm deep and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 110.12 Sqm - - - - - - - - - - - - - - - - - - - - - -
4 Dismantling (AR1616) :.Dismantling G.C.I. or A.C. sheet roofing - Dismantling G.C.I. or A.C. sheet roofing after carefully removing the bolts and nuts including stacking of he materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 44.1 Sqm - - - - - - - - - - - - - - - - - - - - - -
5 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 42.8 Sqm 0.0358 1.53224 0.015 0.642 - - - - - - - - - - - - - - - - - -
6 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 26.1 Sqm 0.043 1.1223 0.018 0.4698 - - - - - - - - - - - - - - - - - -
7 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 3.26232 Cum 0.672 2.19227904 0.28 0.9134496 1 3.26232 350 1141.812 - - - - - - - - - - - - - -
8 Roofing (AR1135i) :.G.C.I. Sheet (0.40mm thick) in walling - Supplying, fitting & fixing of G.C.I. Sheet (0.40mm thick) in walling including cost of nuts and bolts, fitting, labour and material etc. complete as per direction of Engineer-in-Charge. 105.36 Sqm - - - - - - - - 0.10752688172043 11.329032258065 1 105.36 - - - - - - - - - -
9 Concrete (AR0304) :.Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal - Cement concrete (1:4:8) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 9.4255 Cum 1.72 16.21186 0.48 4.52424 - - - - - - - - 0.96 9.04848 - - - - - - - -
10 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 74.265 Sqm - - - - - - - - - - - - - - 0.25 18.56625 - - - - - -
11 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 80.29 Sqm 0.0858 6.888882 0.012 0.96348 - - - - - - - - - - - - 0.023 1.84667 - - - -
12 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 166.78 Sqm - - - - - - - - - - - - - - - - - - 0.125 20.8475 0.084 14.00952
Total Qty 27.94756104 7.5129696 3.26232 1141.812 11.329032258065 105.36 9.04848 18.56625 1.84667 20.8475 14.00952
Rate Per Unit 579.922 548.19 33 6.4484 30 334.5222638 1466.56 70.52622 1556.5 195.21622 125.92622
Total Amount 16207.405493439 4118.534805024 107.65656 7362.8605008 339.87096774194 35245.265713968 13270.1388288 1309.407432075 2874.341855 4069.77014645 1764.1658976144
Total Material Amount (in Rs.): 86669.418200912