State: Odisha District: Dhenkanal Block: Bhuban Gram Panchayat: Ektali
Work Code: OD/352/3349/117245/402582/00041686 (REPAIR AND MAINTENANCE OF CC ROAD FROM RD ROAD TO CHANDAR)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhuban Proposal Date: -
Date of Commencement: - Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: MAINTENANCE OF ROADS AND BRIDGES
Project Sub-Category: CC Road Project Type: Repair and Maintenance
Name of Executant:
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.: 32004
Fund Sanction Amount (in Rs.): 270000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRM056 BRM104 BRM092 BRM029
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 32.508 Cum 3.23 105.00084 0.45 14.6286 0.9 29.2572 - - - - - -
2 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 17.2 Sqm - - - - - - 0.00267 0.045924 0.126 2.1672 - -
3 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 36.12 Cum - - - - - - - - - - 1 36.12
Total Qty 105.00084 14.6286 29.2572 0.045924 2.1672 36.12
Rate Per Unit 553.802 417.99 2063.23 58953.566 609.586 413.05
Total Amount 58149.67519368 6114.608514 60364.332756 2707.383564984 1321.0947792 14919.366
Total Material Amount (in Rs.): 143576.46080786