State: Odisha District: Malkangiri Block: Korukonda Gram Panchayat: Korukonda
Work Code: OD/364/3482/119969/430305/00046756 (Construction of Guard wall at Mauliguda under CMSA for the year 24-25 )
Project Category: CD Work
Financial Year: 2024-25 Execution Level: ps
Executing Agency: Panchayat Samiti, Korukonda Proposal Date: 06-03-2025
Date of Commencement: 08-08-2025 Date of Completion: 11-08-2025
Scheme Name: Chief Minister Special Assistant Scheme Component Name: Special Problem Fund (SPF) 16 th Phase
Project Sub-Category: Slab Culvert Project Type: New Work
Name of Executant: BAPUJI NAYAK
Administrative Approval Details
Approval No.: OD/364/3482/119969/430305/00046756/AS
Technical Sanction Details
Technical Sanction No.: OD/364/3482/119969/430305/00046756/TS
Fund Sanction No.: 1363
Fund Sanction Amount (in Rs.): 200000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102a3) :.Earthwork in hard soil or gravelly soil within 100m to 125m lead and 1.5m, initial lift - Earthwork in hard soil or gravelly soil within 100m to 125m lead and 1.5m, initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the Engineer-in-charge. 17.64 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.47 Cum 1 1.47 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 29.89 Cum - - 2.29 68.4481 0.48 14.3472 0.96 28.6944 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 0.98 Cum - - 3.23 3.1654 0.45 0.441 - - 0.9 0.882 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 98 Sqm - - - - - - - - - - 0.00267 0.26166 0.126 12.348
Total Qty 1.47 71.6135 14.7882 28.6944 0.882 0.26166 12.348
Rate Per Unit 543.25 567.102 548.19 1401.46 1802.83 58620.646 276.666
Total Amount 798.5775 40612.159077 8106.743358 40214.053824 1590.09606 15338.67823236 3416.271768
Total Material Amount (in Rs.): 110076.57981936