State: Odisha District: Khordha Block: Bolagarh Gram Panchayat: Kalanga
Work Code: OD/362/3461/119629/407012/00056253 (KALANGA TO PANDA SAHI ROAD )
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Bolagarh Proposal Date: 22-04-2021
Date of Commencement: 09-10-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: All Weather Connectivity
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: SANGEETA MAHARANA
Administrative Approval Details
Approval No.: OD/362/3461/119629/407012/00056253/AS
Technical Sanction Details
Technical Sanction No.: OD/362/3461/119629/407012/00056253/TS
Fund Sanction No.: 8652
Fund Sanction Amount (in Rs.): 230376
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM045 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 15.33 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 12.81 Cum 1 12.81 - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 16.8 Sqm - - 0.00267 0.044856 0.126 2.1168 - - - - - - - -
4 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 15.33 Cum - - - - - - 2.29 35.1057 0.48 7.3584 0.96 14.7168 - -
5 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.33 Cum - - - - - - 3.23 49.5159 0.45 6.8985 - - 0.9 13.797
Total Qty 12.81 0.044856 2.1168 84.6216 14.2569 14.7168 13.797
Rate Per Unit 918.1 58573.086 229.106 569.387 924.49 1519.07 2104.42
Total Amount 11760.861 2627.354345616 484.9715808 48182.4389592 13180.361481 22355.849376 29034.68274
Total Material Amount (in Rs.): 127626.51948262