State: Odisha District: Rayagada Block: Muniguda Gram Panchayat: Saradhapur
Work Code: OD/370/3554/121221/424749/00056749 (REPAIR AND MAINTANCE OF SARADHAPUR HIGH SCHOOL )
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Muniguda Proposal Date: -
Date of Commencement: 11-11-2025 Date of Completion: -
Scheme Name: Construction of Additional Class Room in Secondary Schools Scheme Component Name: Self/Personal Deposit
Project Sub-Category: Secondary School Project Type: Repair and Maintenance
Name of Executant: Sanjam Kumar Nayak
Administrative Approval Details
Approval No.: OD/370/3554/121221/424749/00056749/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3554/121221/424749/00056749/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 120000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM253 BRM142 BRM141 BRM340 BRM028 BRM064 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Dismantling (AR1621) :.Removing old grading plaster from roof - Removing old grading plaster from roof slab, cleaning the surface,lowering and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 90.25 Sqm - - - - - - - - - - - - - -
2 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 216 Sqm 0.084 18.144 - - - - - - - - - - - -
3 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 216 Sqm - - 0.25 54 - - - - - - - - - -
4 Painting(AR0903i) :.Painting two coats of enamel paint in outer surface paint (outer surface) - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 6.4 Sqm - - - - 0.125 0.8 - - - - - - - -
5 Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 6 Sqm - - - - - - 0.0358 0.2148 0.015 0.09 - - - -
6 Concrete (AR0318) :.4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) - 4cm thick grading concrete (1:2:4) on roof slab with 12mm size hard granite chips (Crusher Broken) including hoisting and laying in position compacting and curing for the proper period with cost conveyance, royalty, taxes of all materials, labor and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (Old Work) 90.25 Sqm - - - - - - 0.1287 11.615175 0.018 1.6245 0.018 1.6245 0.018 1.6245
7 Dismantling (AR1612) :.Dismantling and removing 2.5 cm. thick artificial stone flooring - Dismantling and removing 2.5 cm. thick artificial stone flooring including stacking the useful materials for reuse and removing the debris within 50m lead and as per direction of Engineer-in-Charge. 24 Sqm - - - - - - - - - - - - - -
8 Flooring (AR0802i) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG crusher broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 24 Sqm - - - - - - 0.0858 2.0592 0.012 0.288 - - 0.023 0.552
Total Qty 18.144 54 0.8 13.889175 2.0025 1.6245 2.1765
Rate Per Unit 159.33732 70.30732 205.64732 543.752 417.99 1191.31 1737.73
Total Amount 2891.01633408 3796.59528 164.517856 7552.2666846 837.024975 1935.283095 3782.169345
Total Material Amount (in Rs.): 20958.87356968