State: Odisha District: Puri Block: Astaranga Gram Panchayat: Nagar
Work Code: OD/369/3536/120883/409198/00061967 (Construction of CC road from Deba Behera house to Nua-kaliakana)
Project Category: Road
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Astaranga Proposal Date: -
Date of Commencement: 16-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Maintenance and improvement of Road infrastructure
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: RASMIREKHA SAHOO
Administrative Approval Details
Approval No.: OD/369/3536/120883/409198/00061967/AS
Technical Sanction Details
Technical Sanction No.: OD/369/3536/120883/409198/00061967/TS
Fund Sanction No.: 11088
Fund Sanction Amount (in Rs.): 800000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.9698 Cum - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 52.10655 Cum 1 52.10655 - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 64.90465 Cum - - 2.29 148.6316485 0.48 31.154232 0.96 62.308464 - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 41.8223625 Cum - - 3.23 135.086230875 0.45 18.820063125 - - 0.9 37.64012625
Total Qty 52.10655 283.717879375 49.974295125 62.308464 37.64012625
Rate Per Unit 401.61 595.407 897.85 2251.71 2663.33
Total Amount 20926.5115455 168927.61140503 44869.420877981 140300.59147344 100248.07744541
Total Material Amount (in Rs.): 475272.21274736