State: Odisha District: Mayurbhanj Block: Morada Gram Panchayat: Ghalmuhan
Work Code: OD/365/3502/120282/389986/00062560 (CONST OF MARKET COMPLEX NEAR NEW HAT AT ANUA)
Project Category: Building
Financial Year: 2023-24 Execution Level: ps
Executing Agency: Panchayat Samiti, Morada Proposal Date: -
Date of Commencement: 14-11-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Creation of Capital Asset for Revenue Generation
Project Sub-Category: Market Complex Project Type: New Work
Name of Executant: SONAMANI HEMBRAM
Administrative Approval Details
Approval No.: OD/365/3502/120282/389986/00062560/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3502/120282/389986/00062560/TS
Fund Sanction No.: 13761
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRMMR0025 BRM060 BRM052 BRM104 BRM092 BRM094 BRM084 BRM162 BRM341 BRM057 BRMM105 BRM141 BRM253 BRM252 BRM142 BRM255
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 33.411275488 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 35.69048339328 Cum 1 35.69048339328 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.75276111744 Cum - - 2.29 24.623822958938 0.48 5.1613253363712 0.96 10.322650672742 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 12.48981314317 Cum - - 0.672 8.3931544322102 0.28 3.4971476800876 - - 350 4371.4346001095 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 26.3080203664 Cum - - 0.672 17.678989686221 0.28 7.366245702592 - - 350 9207.80712824 1 26.3080203664 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 4.66887964736 Cum - - 3.4733 16.216419679175 0.45 2.100995841312 - - - - - - 0.36 1.6807966730496 0.54 2.5211950095744 0.004005 0.018698862987677 0.189 0.88241825335104 - - - - - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 1.86072807648 Cum - - 3.4733 6.462866828038 0.45 0.837327634416 - - - - - - 0.36 0.6698621075328 0.54 1.0047931612992 0.01335 0.024840719821008 0.63 1.1722586881824 - - - - - - - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.48844144352 Cum - - 3.4733 5.169803665778 0.45 0.669798649584 - - - - - - 0.36 0.5358389196672 0.54 0.8037583795008 0.0741335 0.11034337375319 - - 3.7695 5.6106800213486 - - - - - - - - - - - - - - - - - - - -
9 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.0069017581344 Cum - - 3.4733 13.917171876528 0.45 1.8031057911605 - - - - - - 0.36 1.4424846329284 0.54 2.1637269493926 0.041529 0.16640262311356 - - - - 4.4196 17.708903010251 - - - - - - - - - - - - - - - - - -
10 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 8.136867876 Cum - - 3.4733 28.261783193711 0.45 3.6615905442 - - - - - - 0.36 2.92927243536 0.54 4.39390865304 0.0502172 0.40861072150267 - - - - 6.2216 50.624337177322 - - - - - - - - - - - - - - - - - -
11 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 17.91 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 0.8 14.328 1.05 18.8055 - - - - - - - - - - - - - -
12 Plastering (AR1017) :.20mm thick cement Plaster in CM (1:4) over masonry work in inside. - 20mm thick cement Plaster in CM (1:4) over stone work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 71.18878181 Sqm - - 0.0744 5.296445366664 0.021 1.49496441801 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 68.5362989667 Sqm - - 0.0858 5.8804144513429 0.012 0.8224355876004 - - - - - - - - - - - - - - - - - - - - - - 0.023 1.5763348762341 - - - - - - - - - - - -
14 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 140.469336 Sqm - - 0.043 6.040181448 0.018 2.528448048 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
15 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 111.243445745 Sqm - - 0.0358 3.982515357671 0.015 1.668651686175 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
16 Plastering (AR1027) :.6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces including chipping (Inside) - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 67.5532830334 Sqm - - 0.0372 2.5129821288425 0.0075 0.5066496227505 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
17 miscellaneous(ARM105) :.Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. 13.656741 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 13.656741 - - - - - - - - - -
18 Painting(AR0905) :.Painting two coats of enamel on old wood work in inner surface paint - Painting two coats of enamel paint on old wood work in inner surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Inside) 30.72766725 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 3.84095840625 - - - - - - - -
19 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 208.01 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 17.47284 - - - - - -
20 Painting(AR0901ci) :.Priming one coat with outer surface primer of approved quality oil-bound primer over plastering surfaces(Outer surface) - Priming one coat with outer surface primer of approved quality oil-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 111.243 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 9.344412 - - - -
21 Painting(AR0922) :.Finishing wall two coats with distemper of approved shades on new work (Inside) - Finishing wall two coats with distemper of approved shades on new work to give an even shade including all costs of labor, Paint and Brushes required for the work, etc. complete and as per direction of the Engineer-in-charge.(Inside) 208.01 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.25 52.0025 - -
22 Painting(AR0918ca) :.Finishing wall two coats with weather coat with one coat oilbound Primer - Finishing wall surface two coats with weather coat with one coat oilbound Primer including all costs of labour, Paint, Primer, Brushes and putty required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 111.243 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 9.344412 - - 0.125 13.905375
Total Qty 35.69048339328 144.43655107312 32.118686542259 10.322650672742 13579.241728349 26.3080203664 7.258254768538 10.887382152807 0.72889630117811 2.0546769415334 5.6106800213486 68.333240187572 14.328 18.8055 1.5763348762341 13.656741 3.84095840625 17.47284 18.688824 52.0025 13.905375
Rate Per Unit 531.74 644.787 538.16 1930.76 6.4531 33 2315.51 1658.3 58573.086 229.106 240.106 250.166 90 6855.747 2020.7 16.22 205.34 159.27787 125.74787 70.34787 195.03787
Total Amount 18978.057639543 93130.810456783 17284.992349582 19930.561012904 87628.204797212 868.1646720912 16806.561499097 18054.545824 42693.705733987 470.73881536696 1347.1579372059 17094.653364764 1289.52 128925.7502085 3185.2998844062 221.51233902 788.70239913937 2783.0367380508 2350.0798108049 3658.265109675 2712.0747215512
Total Material Amount (in Rs.): 480202.39531368