State: Odisha District: Nabarangpur Block: Nandahandi Gram Panchayat: Padalguda
Work Code: OD/366/3518/120507/924883/00064629 (CONSTRUCTION OF CC ROAD AT MAHALAXMI NAGAR)
Project Category: Road
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Nandahandi Proposal Date: 11-08-2025
Date of Commencement: 15-11-2025 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD
Project Sub-Category: CC Road Project Type: Upgradation or Improvement
Name of Executant: Debasis Nayak
Administrative Approval Details
Approval No.: OD/366/3518/120507/924883/00064629/AS
Technical Sanction Details
Technical Sanction No.: OD/366/3518/120507/924883/00064629/TS
Fund Sanction No.: 4648
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM104 BRM092 BRM340 BRM028 BRM056 BRM044
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 4.672272 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 23.08102368 Cum 1 23.08102368 - - - - - - - - - - - -
3 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 62.337913 Sqm - - 0.00267 0.16644222771 0.126 7.854577038 - - - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 15.32505216 Cum - - - - - - 3.23 49.4999184768 0.45 6.896273472 0.9 13.792546944 - -
5 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.8369952 Cum - - - - - - 2.29 70.616719008 0.48 14.801757696 - - 0.96 29.603515392
Total Qty 23.08102368 0.16644222771 7.854577038 120.1166374848 21.698031168 13.792546944 29.603515392
Rate Per Unit 478.15 58573.086 229.106 585.117 417.24 1802.83 1401.46
Total Amount 11036.191472592 9749.0349176894 1799.530726868 70282.286575194 9053.2865245363 24865.617407052 41488.142681272
Total Material Amount (in Rs.): 168274.0903052