State: Odisha District: Balangir Block: Turekela Gram Panchayat: Buromal
Work Code: OD/345/3297/116027/421208/00065430 (CONSTRUCTION OF CC ROAD FROM JAGANNATH MANDIR TO KUKUDAHAD)
Project Category: Road
Financial Year: 2022-23 Execution Level: ps
Executing Agency: Panchayat Samiti, Turekela Proposal Date: -
Date of Commencement: 02-12-2025 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: CC Road Project Type: New Work
Name of Executant: TEJU PUTEL
Administrative Approval Details
Approval No.: OD/345/3297/116027/421208/00065430/AS
Technical Sanction Details
Technical Sanction No.: OD/345/3297/116027/421208/00065430/TS
Fund Sanction No.: 24940
Fund Sanction Amount (in Rs.): 300000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 3.238734 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 25.300990008 Cum 1 25.300990008 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 30.70319832 Cum - - 2.29 70.3103241528 0.48 14.7375351936 0.96 29.4750703872 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 18.352826 Cum - - 3.23 59.27962798 0.45 8.2587717 - - 0.9 16.5175434 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 56.67083 Sqm - - - - - - - - - - 0.00267 0.1513111161 0.126 7.14052458
Total Qty 25.300990008 129.5899521328 22.9963068936 29.4750703872 16.5175434 0.1513111161 7.14052458
Rate Per Unit 413.05 528.967 417.99 1128.47 1737.73 58573.086 229.106
Total Amount 10450.573922804 68548.808209831 9612.2263184559 33261.732679844 28703.030692482 8862.7590160813 1635.9370244255
Total Material Amount (in Rs.): 161075.06786392