State: Odisha District: Rayagada Block: Padmapur Gram Panchayat: Derigam
Work Code: OD/370/3555/121225/427025/00070961 (CONSTRUCTION OF PROTECTION WALL WITH CC FROM PWD ROAD TO GOUDA SAHI, DERIGAON GP)
Project Category: Other Infrastructure
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Padmapur Proposal Date: -
Date of Commencement: 06-02-2026 Date of Completion: -
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO PANCHAYAT SAMITI
Project Sub-Category: Boundary Wall Project Type: New Work
Name of Executant: SAMEER KUMAR SWAIN
Administrative Approval Details
Approval No.: OD/370/3555/121225/427025/00070961/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3555/121225/427025/00070961/TS
Fund Sanction No.: 14036
Fund Sanction Amount (in Rs.): 202000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM045 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 29.98125 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 13.74 Cum 1 13.74 - - - - - - - - - - - -
3 Concrete (AR0303a) :.Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal - Cement concrete (1:3:6) with 4 cm. hard granite(Hand Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 20.535 Cum - - 2.29 47.02515 0.48 9.8568 0.96 19.7136 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 10.305 Cum - - 3.23 33.28515 0.45 4.63725 - - 0.9 9.2745 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 19.236 Sqm - - - - - - - - - - 0.00267 0.05136012 0.126 2.423736
Total Qty 13.74 80.3103 14.49405 19.7136 9.2745 0.05136012 2.423736
Rate Per Unit 543.25 594.747 548.19 1193.57 1802.83 58573.086 229.106
Total Amount 7464.255 47764.3099941 7945.4932695 23529.561552 16720.346835 3008.3207257303 555.292460016
Total Material Amount (in Rs.): 106987.57983635