State: Odisha District: Rayagada Block: Gudari Gram Panchayat: Karlaghati
Work Code: OD/370/3549/121134/426854/00071247 (Construction of Canal from kusum tree to hara Billa at Sambarlendi, Karlaghati)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Gudari Proposal Date: -
Date of Commencement: 20-01-2026 Date of Completion: 26-01-2026
Scheme Name: SFC Devolution of Fund Scheme Component Name: 5TH SFC DEVOLUTION GRANT TO ZILLA PARISHAD
Project Sub-Category: Canal Project Type: New Work
Name of Executant: Tapash Kumar Ghadai
Administrative Approval Details
Approval No.: OD/370/3549/121134/426854/00071247/AS
Technical Sanction Details
Technical Sanction No.: OD/370/3549/121134/426854/00071247/TS
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 250000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM056 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 52.44 Cum - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 1.9 Cum 1 1.9 - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 37.125 Cum - - 2.29 85.01625 0.48 17.82 0.96 35.64 - - - - - -
4 Concrete (AR0307) :.Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum - Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. 3.762 Cum - - 3.23 12.15126 0.45 1.6929 - - 0.9 3.3858 - - - -
5 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 45.6 Sqm - - - - - - - - - - 0.00267 0.121752 0.126 5.7456
Total Qty 1.9 97.16751 19.5129 35.64 3.3858 0.121752 5.7456
Rate Per Unit 413.05 600.692 417.99 1356.21 1802.83 58620.646 276.666
Total Amount 784.795 58367.74591692 8156.197071 48335.3244 6104.021814 7137.180891792 1589.6121696
Total Material Amount (in Rs.): 130474.87726331