State: Odisha District: Bhadrak Block: Bhadrak Gram Panchayat: Gujidarada
Work Code: OD/348/3323/116631/394845/00071252 (Const. of Facility Centre at GP Office Gujidarda)
Project Category: Building
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Bhadrak Proposal Date: -
Date of Commencement: 23-12-2025 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Provision of Facilities at GP Head Quarter
Project Sub-Category: GP Facility Centre Project Type: New Work
Name of Executant: PEO GUJIDARADA GP
Administrative Approval Details
Approval No.: OD/348/3323/116631/394845/00071252/AS
Technical Sanction Details
Technical Sanction No.: OD/348/3323/116631/394845/00071252/TS
Fund Sanction No.: 17728
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM340 BRM028 BRMMR0025 BRM005 BRM162 BRM341 BRM060 BRM052 BRM084 BRM104 BRM094 BRM029 BRM044 BRM092 BRMM105 BRM064 BRM137 BRM141 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Plastering (AR1027) :.First Floor - 6mm thick cement Plaster in CM (1:4) over R.C.C. surfaces in inside including chipping with proper level and line, curing for the proper period with cost conveyance, royalty, taxes of all materials, labor, and T & P required for the work, etc comp. and as per the direction of the Engineer-in-charge. 158.314 Sqm 0.0372 5.8892808 0.0075 1.187355 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Masonry Brick Work (AR0603bi) :.First floor - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 15.9745 Cum 0.672 10.734864 0.28 4.47286 1 15.9745 350 5591.075 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 R.C.C. Work (AR0409) :.First floor - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 20 Qntl - - - - - - - - 0.8 16 1.05 21 - - - - - - - - - - - - - - - - - - - - - - - - - -
4 Plastering (AR1004) :.First Floor - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 84.18 Sqm 0.0358 3.013644 0.015 1.2627 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
5 Plastering (AR1014) :.First Floor - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 74.13 Sqm 0.043 3.18759 0.018 1.33434 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Ac) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 5.756 Cum 3.4733 19.9923148 0.45 2.5902 - - - - - - - - 0.36 2.07216 0.54 3.10824 5.30352 30.52706112 0.0498348 0.2868491088 - - - - - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ad) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 1.46475 Cum 3.4733 5.087516175 0.45 0.6591375 - - - - - - - - 0.36 0.52731 0.54 0.790965 - - 0.0889602 0.13030445295 4.5234 6.62565015 - - - - - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ag) :.First Floor - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 13.6435 Cum 3.4733 47.38796855 0.45 6.139575 - - - - - - - - 0.36 4.91166 0.54 7.36749 7.46592 101.86127952 0.06026064 0.82216604184 - - - - - - - - - - - - - - - - - -
9 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 10.368 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
10 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 10.88224 Cum - - - - - - - - - - - - - - - - - - - - - - 1 10.88224 - - - - - - - - - - - - - -
11 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 2.58904 Cum 2.29 5.9289016 0.48 1.2427392 - - - - - - - - - - - - - - - - - - - - 0.96 2.4854784 - - - - - - - - - - - -
12 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 27.6 Sqm 0.0358 0.98808 0.015 0.414 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 24.6 Sqm 0.043 1.0578 0.018 0.4428 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
14 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 4.1 Qntl - - - - - - - - 0.8 3.28 1.05 4.305 - - - - - - - - - - - - - - - - - - - - - - - - - -
15 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 1.728 Cum 3.4733 6.0018624 0.45 0.7776 - - - - - - - - 0.36 0.62208 0.54 0.93312 - - 0.004005 0.00692064 - - - - - - 0.189 0.326592 - - - - - - - - - -
16 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 1.26625 Cum 3.4733 4.398066125 0.45 0.5698125 - - - - - - - - 0.36 0.45585 0.54 0.683775 - - 0.01335 0.0169044375 - - - - - - 0.63 0.7977375 - - - - - - - - - -
17 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 0.34965 Cum 3.4733 1.214439345 0.45 0.1573425 - - - - - - - - 0.36 0.125874 0.54 0.188811 - - 0.0741335 0.025920778275 3.7695 1.318005675 - - - - - - - - - - - - - - - -
18 R.C.C. Work (AR0404Ae) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Stairs excluding landing but including railing) 2.197275 Cum 3.4733 7.6317952575 0.45 0.98877375 - - - - - - - - 0.36 0.791019 0.54 1.1865285 - - 0.04806 0.1056010365 1.17 2.57081175 - - - - - - - - - - - - - - - -
19 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 6.44 Cum 0.672 4.32768 0.28 1.8032 - - 350 2254 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
20 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 2.04525 Cum 3.4733 7.103766825 0.45 0.9203625 - - - - - - - - 0.36 0.73629 0.54 1.104435 4.4196 9.0391869 0.041529 0.08493718725 - - - - - - - - - - - - - - - - - -
21 miscellaneous(ARM105) :.Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. - Labour for fitting and fixing of M.S. window grills including cost of screws complete. (Iron works) and as directed by Engineer-in-Charge. 13.32 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 13.32 - - - - - - - -
22 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 4.5 Qntl - - - - - - - - - - 1 4.5 - - - - - - - - - - - - - - - - - - - - - - - - - -
23 Concrete (AR0317) :.First floor - 2.5 cm thick grading concrete (1:2:2) on roof slab with 6mm size hard granite chips including hoisting and laying in position compacting and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. (new work) 105.908 Sqm 0.1208 12.7936864 0.0169 1.7898452 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.0169 1.7898452 - - - - - -
24 Painting(AR0901b) :.First Floor - Priming one coat in inner surface with primer of approved quality over iron work including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 38.7675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.054 2.093445 - - - -
25 Painting(AR0903i) :.First Floor - Painting two coats of enamel paint in outer surface paint including all costs of labour, Paint and brushes required for the work etc. complete and as per direction of Engineer-in-charge.(Outside) 38.7675 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 4.8459375 - -
26 Painting(AR0901d) :.First Floor - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 200 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 16.8
Total Qty 146.7392562775 26.75264315 15.9745 7845.075 19.28 29.805 10.242243 15.3633645 141.42752754 1.479603683115 10.514467575 10.88224 2.4854784 1.1243295 13.32 1.7898452 2.093445 4.8459375 16.8
Rate Per Unit 568.867 852.24 33 6.6251 90.1 6204.637 2593.38 2557 250.166 58573.086 240.106 849.49 2169.96 229.106 16.22 2024.91 142.94787 205.58787 159.27787
Total Amount 83475.120500813 22799.672598156 527.1585 51974.4063825 1737.128 184929.205785 26562.02815134 39284.1230265 35380.358854572 86664.953777012 2524.5867515629 9244.3540576 5393.388708864 257.590634427 216.0504 3624.275443932 299.25350371215 996.26596877813 2675.868216
Total Material Amount (in Rs.): 558565.78926077