State: Odisha District: Mayurbhanj Block: Baripada Gram Panchayat: Khadisole
Work Code: OD/365/3490/120104/390491/00071842 (Renovation with Toe wall at Dumapada Bhalu bandha tank)
Project Category: Water Body
Financial Year: 2025-26 Execution Level: ps
Executing Agency: Panchayat Samiti, Baripada Proposal Date: -
Date of Commencement: 29-01-2026 Date of Completion: -
Scheme Name: Bikashita Gaon Bikashita Odisha Scheme Component Name: Viksit Gaon Vikshit Odisha (VGVO)
Project Sub-Category: Tank Project Type: New Work
Name of Executant: CHAPALA CHANDA PRADHAN
Administrative Approval Details
Approval No.: OD/365/3490/120104/390491/00071842/AS
Technical Sanction Details
Technical Sanction No.: OD/365/3490/120104/390491/00071842/TS
Fund Sanction No.: 7323
Fund Sanction Amount (in Rs.): 314244
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM104 BRM092
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 18.3492864 Cum - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 3.5679168 Cum 1 3.5679168 - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 26.5045248 Cum - - 2.29 60.695361792 0.48 12.722171904 0.96 25.444343808 - - - -
4 R.C.C. Work (AR0410c) :.R.C.C. foundation , plinth band and footings bases of columns mass concrete precast slabs etc - Rigid and smooth centring and shuttering for R.C.C. works including false works and dismantling them after casting including cost of materials complete in ground floor R.C.C. foundation, plinth band and footings bases of columns mass concrete precast slabs, etc 66.89016 Sqm - - - - - - - - 0.00267 0.1785967272 0.126 8.42816016
5 Earth Work (AR0102b) :.Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift and Compaction with P.R.R - Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per specification approved by the Department alongwith proper compaction with P.R.R. including hire and running charges of P.R.R. (section measurement to be taken on the finished compacted section of the fill) as per direction of Engineer-in-Charge. 509.7024 Cum - - - - - - - - - - - -
Total Qty 3.5679168 60.695361792 12.722171904 25.444343808 0.1785967272 8.42816016
Rate Per Unit 531.74 656.567 538.16 1739.98 58620.646 276.666
Total Amount 1897.204079232 39850.571605688 6846.5640318566 44272.649339044 10469.45552195 2331.7853588266
Total Material Amount (in Rs.): 105668.2299366