State: Odisha District: Jajpur Block: Korei Gram Panchayat: Talagarh
Work Code: OD/356/3401/118460/400751/00072995 (DEVELOPMENT OF NUAGADA HAAT AT NUAGADA)
Project Category: Other Infrastructure
Financial Year: 2021-22 Execution Level: ps
Executing Agency: Panchayat Samiti, Korei Proposal Date: -
Date of Commencement: 07-01-2026 Date of Completion: -
Scheme Name: 5th SFC Grant in Aid Scheme Component Name: Development of Rural Haat
Project Sub-Category: Rural Haat Project Type: New Work
Name of Executant: Bijay Kumar Nayak
Administrative Approval Details
Approval No.: OD/356/3401/118460/400751/00072995/AS
Technical Sanction Details
Technical Sanction No.: OD/356/3401/118460/400751/00072995/TS
Fund Sanction No.: 312
Fund Sanction Amount (in Rs.): 1000000
MATERIAL STATEMENT
Sl.No. Activity Name Quantity (A) Unit BRM029 BRM340 BRM028 BRM044 BRM005 BRM060 BRM052 BRM104 BRM092 BRM084 BRM094 BRMMR0025 BRM162 BRM341 BRM057 BRM253
Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B) Qty/unit (B) Total Qty (A*B)
1 Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge 27.864 Cum - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
2 Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. 67.10625 Cum 1 67.10625 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
3 Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. 10.79625 Cum - - 2.29 24.7234125 0.48 5.1822 0.96 10.3644 - - - - - - - - - - - - - - - - - - - - - - - -
4 Masonry Brick Work (AR0603b) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 18.144 Cum - - 0.672 12.192768 0.28 5.08032 - - 350 6350.4 - - - - - - - - - - - - - - - - - - - - - -
5 R.C.C. Work (AR0404Aa) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC foundation, footing bases of column, mass concreate, pre-cast slabs etc.) 3.264 Cum - - 3.4733 11.3368512 0.45 1.4688 - - - - 0.36 1.17504 0.54 1.76256 0.004005 0.01307232 0.189 0.616896 - - - - - - - - - - - - - -
6 R.C.C. Work (AR0404Ab) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Plinth band) 3.945 Cum - - 3.4733 13.7021685 0.45 1.77525 - - - - 0.36 1.4202 0.54 2.1303 0.01335 0.05266575 0.63 2.48535 - - - - - - - - - - - - - -
7 R.C.C. Work (AR0404Ac) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge. (RCC Beams, Column, Girder & Bressmer etc) 4.14 Cum - - 3.4733 14.379462 0.45 1.863 - - - - 0.36 1.4904 0.54 2.2356 0.041529 0.17193006 - - 4.4196 18.297144 - - - - - - - - - - - -
8 R.C.C. Work (AR0404Ad) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Lintels) 2.64 Cum - - 3.4733 9.169512 0.45 1.188 - - - - 0.36 0.9504 0.54 1.4256 0.0741335 0.19571244 - - - - 3.7695 9.95148 - - - - - - - - - -
9 R.C.C. Work (AR0404Ag) :.Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips - Reinforced cement concrete work of M-20 grade with 20mm & down grade size black hard crusher broken granite chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty,taxes of all materials, labour and T&P required for the work etc. (including centring and shuttering) complete and as per direction of Engineer-in charge (RCC Roof slab, landing, balcony, sun shade) 9.843 Cum - - 3.4733 34.1876919 0.45 4.42935 - - - - 0.36 3.54348 0.54 5.31522 0.0502172 0.4942878996 - - 6.2216 61.2392088 - - - - - - - - - - - -
10 Masonry Brick Work (AR0603bi) :.Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure - Brickwork with Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. 26.07 Cum - - 0.672 17.51904 0.28 7.2996 - - 350 9124.5 - - - - - - - - - - - - 1 26.07 - - - - - - - -
11 R.C.C. Work (AR0409) :.Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position - Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. 21.3465 Qntl - - - - - - - - - - - - - - - - - - - - - - - - 0.8 17.0772 1.05 22.413825 - - - -
12 Plastering (AR1004) :.12mm thick cement plster (1:6) over Brick work in inside - 12mm thick cement plster (1:6) over Brick work in inside including racking out joints finishing smooth with proper plumb and line curing for proper period with cost conveyance, royality, taxes of all materials, labour and T & P required for the work etc. comp.and as per direction of Engineer-in-charge. 79.56 Sqm - - 0.0358 2.848248 0.015 1.1934 - - - - - - - - - - - - - - - - - - - - - - - - - -
13 Plastering (AR1014) :.16mm thick cement Plaster in CM (1:6) over brick work in inside. - 16mm thick cement Plaster in CM (1:6) over brick work in inside including racking out joints finishing smooth with proper plumb and line, curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T & P required for the work etc comp.and as per direction of Engineer-in-charge. 156.88 Sqm - - 0.043 6.74584 0.018 2.82384 - - - - - - - - - - - - - - - - - - - - - - - - - -
14 Iron Work(AR1704) :.Iron Doors and windows fixing - Supplying, fitting & fixing of Mild steel and put up for frames & shutters of Doors and windows fixing in position with cost, conveyance, taxes of all materials, labours and T & P required for the work etc. as per direction of Engineer-in-charge. 6.0498 Qntl - - - - - - - - - - - - - - - - - - - - - - - - - - 1 6.0498 - - - -
15 Flooring (AR0802ii) :.2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips - 2.5 cm thick A.S. flooring in C.C (1:2:4) with 12 mm size HG Hand broken chips including punning incl. cost, conveyance & royalty of materials as per direction of Engineer-in-charge. 57.5625 Sqm - - 0.0858 4.9388625 0.012 0.69075 - - - - - - - - - - - - - - - - - - - - - - 0.023 1.3239375 - -
16 Painting(AR0901d) :.Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces (Inner surface) - Priming one coat with inner surface primer of approved quality water-bound primer over plastering surfaces including cost conveyance, taxes of all materials, labor and T&P required for the work complete as per direction of the Engineer-in-charge. 300 Sqm - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.084 25.2
Total Qty 67.10625 151.7438566 32.99451 10.3644 15474.9 8.57952 12.86928 0.9276684696 3.102246 79.5363528 9.95148 26.07 17.0772 28.463625 1.3239375 25.2
Rate Per Unit 543.25 574.612 548.19 1802.51 6.04185 2277.01 2244.2 58573.086 229.106 250.166 240.106 33 90.1 6223.282 1933.41 155.90732
Total Amount 36455.4703125 87193.840928639 18087.2604369 18681.934644 93497.024565 19535.6528352 28881.238176 54336.405049369 710.743172076 19897.291234565 2389.41005688 860.31 1538.65572 177137.16511725 2559.714001875 3928.864464
Total Material Amount (in Rs.): 565690.98071425