| State: Odisha |
District: Kendujhar |
Block: Anandapur |
Gram Panchayat: Panasadiha |
Work Code: OD/361/3443/119262/386985/00074466 (Rep & Maint of Govt.UPSpanasdiha (25-26) asset Management)
Project Category: Building
| Financial Year: 2025-26 |
Execution Level: ps |
| Executing Agency: Panchayat Samiti, Anandapur |
Proposal Date: - |
| Date of Commencement: - |
Date of Completion: - |
| Scheme Name: Asset Management School and Mass Education Department |
Scheme Component Name: Self/Personal Deposit |
| Project Sub-Category: Elementary School |
Project Type: Repair and Maintenance |
| Name of Executant: |
|
Administrative Approval Details
Approval No.:
Technical Sanction Details
Technical Sanction No.:
Fund Sanction No.:
Fund Sanction Amount (in Rs.): 150000
MATERIAL STATEMENT
| Sl.No. |
Activity Name |
Quantity (A) |
Unit |
BRM029 |
BRM340 |
BRM028 |
BRM044 |
BRM006 |
BRM132 |
BRMMR0027 |
CON026 |
| Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
Qty/unit (B) |
Total Qty (A*B) |
| 1 |
Earth Work (AR0102aa) :.Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift - Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge |
1.2 |
Cum |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 2 |
Earth Work (AR0115) :.Filling foundation and plinth with sand well watered and rammed - Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. |
0.3 |
Cum |
1 |
0.3 |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
- |
| 3 |
Concrete (AR0303) :.Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal - Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. |
0.45 |
Cum |
- |
- |
2.29 |
1.0305 |
0.48 |
0.216 |
0.96 |
0.432 |
- |
- |
- |
- |
- |
- |
- |
- |
| 4 |
Masonry Brick Work (AR0603c) :.Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth - Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. |
1.35 |
Cum |
- |
- |
0.672 |
0.9072 |
0.28 |
0.378 |
- |
- |
400 |
540 |
- |
- |
- |
- |
- |
- |
| 5 |
Flooring (AR0817ab) :.Fifth Floor - Fixing Vitrified tiles of premium grade having thickness 8mm to 10mm confirming to IS 13756 of size 600mmx600mm Coloured /Printed series(Homogeneous) in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the Vitrified tiles including rubbing and polishing complete including cost of precast tiles. |
59.975 |
Sqm |
- |
- |
0.1375 |
8.2465625 |
0.015 |
0.899625 |
- |
- |
- |
- |
1 |
59.975 |
1 |
59.975 |
0.1375 |
8.2465625 |
| Total Qty |
0.3 |
10.1842625 |
1.493625 |
0.432 |
540 |
59.975 |
59.975 |
8.2465625 |
| Rate Per Unit |
1008.91 |
655.912 |
1018.91 |
2317.16 |
6.0709 |
722.7213901 |
8.5 |
0 |
| Total Amount |
302.673 |
6679.9799849 |
1521.86944875 |
1001.01312 |
3278.286 |
43345.215371248 |
509.7875 |
0 |
Total Material Amount (in Rs.): 56638.824424898